Site work for a water / sewer project in Alachua, Florida. Completed plans call for site work for a water / sewer project.

Project No- PW\DEN003\EGXM4100 RFB 2023-03 is a solicitation for bids for all labor, materials, services, expenses, equipment, direct and indirect costs, lump sum price, to provide a new raw water well, treatment facilities and Operations Building for the City of Alachua Well Field as described in the identified Final Design Documents (Work, Technical Specifications and Drawings). 1. Task 1: The new raw water well, GST Well No. 1, was designed by Jacobs Engineering Group. The Work to define drilling the new well is specified in Jacobs Specifications, Volume 1 of 4. Refer to the following Specification sections: a. Section 33 21 00, Well Construction General Requirements. b. Section 33 21 12.01, Well Drilling Mobilization and Cleanup. c. Section 33 21 13, Water Wells. d. Section 33 21 13.01, Well Pumping Test. e. Section 33 21 13.02, Well Video Inspection. f. Section 33 21 13.03, Geophysical Logging of Wells. 2. Task 2: The water treatment plant including, wellhead, chemical feed facilities, contact tank, residual analyzers, site civil, yard piping, and yard electrical were designed by Jacobs Engineering Group. The Drawings and Specifications that describe these items can be found in Jacobs Specifications, Volume 1 of 4, and Drawings, Volume 3 of 4. 3. Task 3: The Operations Building was designed by Walker Architects, Inc. The Drawings, technical specifications and standard details for the operations building are bound separately, see Volume 2 of 4 and Volume 4 of 4. Base Bid Work includes the following: 1. Task 1: Construct a new 12-inch diameter raw water well, cased to 220 feet below land surface, entitled Ground Storage Tank (GST) Well No. 1. 2. Task 2: Yard electrical improvements including relocation of an existing underground primary feeder. The primary feeder relocation shall be completed in conjunction with the local utility. 3. Task 2: New electrical gear including a new outdoor rated motor control center and switchboard. 4. Task 2: Site civil and yard piping improvements on the plant site including piping to transmit raw and finish water across the plant site. A 16-inch hot-tap and tie-in with a 12-inch mechanical coupling to the existing potable water piping is included. 5. Task 2: Instrumentation and control equipment including instruments, fiber optic cable, control panels, programable logic controllers, security cameras and SCADA network racks and computers. 6. Task 2: Construct a new wellhead and chemical injection point that includes a 700-gpm submersible pump and static mixer for blending 12.5 percent sodium hypochlorite and 38 percent hydrofluorosilicic acid. 7. Task 2: New chemical storage facility including canopy, high density polyethylene tanks and pump skids for 12.5 percent sodium hypochlorite and 38 percent hydrofluorosilicic acid. 8. Task 2: New welded steel tank to provide contact time to meet Florida Department of Environmental Protection (FDEP) requirements for chlorine residual. 9. Task 2: Install new chlorine and fluoride residual analyzers in an existing room in the GST fire pump building. 10. Task 2: Painting and coating improvements. 11. Task 3: New Operations Building. Question Deadline 05/01/2023 at 3:00 PM ET Questions/Clarification Deadline- submit Online.

Award

Water / Sewer

$7,962,700.00

Public - City

Site Work

134

49

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
41
Bidding Soon
833
All Active Projects
361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2023

July 7, 2023

img_map_placeholder

Multiple Locations, Alachua, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.