BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Boca Raton, Florida. Completed plans call for the renovation of a transportation facility.

Project Description: The project consists of improvements to the Airport Authoritys Administration Building at the Boca Raton Airport (BCT). The Boca Raton Airport Authority (BRAA) wishes to enhance its administration offices to better accommodate public meetings. The purpose of these enhancements is to expand the functionality of the building beyond administrative and management offices to include meeting space adequate for public meetings and monthly BRAA meetings thereby minimizing the need for renting space going forward and to improve the BRAAs emergency preparedness and response. The proposed improvements include: Modifications to the existing Conference Room 113 to provide a new large scale opening in the existing structural masonry bearing wall between the Conference Room 113 and Break Room 112 to expand the usable area of the Conference Room into the current Break Room area in order to function as a larger Board Room for Board meetings. Provide new movable wall partition in the new opening to close it off as needed, and a second new movable wall partition in Break Room 112 to screen the cabinets, sink and counter during Board meetings. Relocation of the existing fixed video screen to the opposite side of Conference Room 113 within the existing millwork and replacing the ceiling mounted projector with a new multi-functional large screen fixed flat-screen display. Provide an A/V control desk millwork station to house the A/V equipment and allow for operation of the A/V broadcast during Board meetings. Modifications to Open Offices 128 and 129, comprising the installation of new permanent wall partitions and door to divide the space into 3 individual offices. ME/FP revisions would also be provided as needed to accommodate renovations. Modifications to Storage 103, Badging 103A and Storage 104 to remove walls and doors and open up this area to one large storage room to accommodate the storage previously utilized in Open Offices 128 and 129. Install a new shower in Toilet Room 107 for use as an emergency shower and for times when the building is being used as an emergency response facility. Provide Mechanical, Electrical and Fire Protection (ME/FP) revisions as needed to accommodate renovations. The bill will be charged to the recipients account. Bid proposals must be submitted on the forms provided by BRAA and accompanied by a bid security in the form of a certified check, cashiers check, money order or a bid bond submitted on the form provided, in favor of BRAA in the amount of not less than five percent (5%) of the bid price. Requests for Clarification Submitted prior to the March 22nd, 2024 deadline.

Award

Transportation Terminals

$427,502.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
139
Bidding Soon
1,930
All Active Projects
812
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 4, 2024

May 6, 2024

October 3, 2023

img_map_placeholder

903 NW 35th St, Boca Raton, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.