BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 2, 2026 at 7:00 PM

Updated January 3, 2026

Site work for a power facility in New Westminster, British Columbia. Conceptual plans call for site work for a power facility.

The City is pursuing the installation of a substation in the Sapperton area to connect to the BC Hydros 69kV transmission source. TIMELINE: Request for proposal seeking a consulting engineering company to undertake a feasibility study, is cancelled. Timeline for re-tender is undetermined. Further update may be determined in late spring 2026, upon approvals.

Conceptual

Power Plant

$1,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
95
Bidding Soon
2,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

Project location map

Brunette Ave, New Westminster, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.