BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated October 30, 2025

Renovation of a transportation facility in Mirabel, Quebec. Completed plans call for the renovation of a transportation facility.

Transformer Station B is the main power supply for Mirabel Airport. This substation is supplied by two Hydro-Quebec lines at a voltage of 25 kV, the main line and the back-up line, and includes 5 S&S oil-filled circuit breakers installed in 1973. In 2013, following a problem with the operation of the circuit breakers and their obsolescence, an assessment of the situation was conducted and led ADM to use existing spare parts in the medium term to extend the life of the equipment. Today, ADM has decided to refurbish the facility. Documents are available at: https://admtl.bonfirehub.ca

Post-Bid

Transportation Terminals

$400,000.00

Public - County

Renovation

36

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
170
Bidding Soon
2,781
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2023

April 27, 2023

Project location map

12300 Rue Service A 4, Mirabel, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.