Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated October 30, 2025
Renovation of a transportation facility in Mirabel, Quebec. Completed plans call for the renovation of a transportation facility.
Transformer Station B is the main power supply for Mirabel Airport. This substation is supplied by two Hydro-Quebec lines at a voltage of 25 kV, the main line and the back-up line, and includes 5 S&S oil-filled circuit breakers installed in 1973. In 2013, following a problem with the operation of the circuit breakers and their obsolescence, an assessment of the situation was conducted and led ADM to use existing spare parts in the medium term to extend the life of the equipment. Today, ADM has decided to refurbish the facility. Documents are available at: https://admtl.bonfirehub.ca
Post-Bid
Transportation Terminals
$400,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2023
April 27, 2023
12300 Rue Service A 4, Mirabel, QC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
