Published April 7, 2025 at 8:00 PM
Updated April 8, 2025
Renovation of a water / sewer project in Attleboro, Massachusetts. Conceptual plans call for the renovation of a water / sewer project.
Update: This capital project entails: (a) cleaning and lining watermains on North Main Street, Kelley Boulevard, Bungay Road, Mount Vernon Avenue, Mansfield Road, Lindsey Street (from the city line, north), and Balcom Street, (b) replace ten aged fire hydrants, (c) replace 20 old line gate valves, and (d) and (re)paving. The existing watermains date back to the 1920s and are constructed of unlined cast iron. Although watermains are structurally sound, cleaning and lining them CAPITAL IMPROVEMENTS PROGRAM, FISCAL YEARS 2026–2030 124 will not only improve water quality for customers in Mansfield, North Attle borough, and other areas north of the city but also reduce the volume of disinfectant used at the Plant. While no additional annual costs are anticipated, the Water Department in fact may realize a reduction in chemical feed as well as a reduction in water usage when flushing to maintain water quality. The relining and cleaning capital project cost is approximately 25% less than replacing the watermains. Project is included in City of Attleboro Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://tinyurl.com/5ynsjve8 This capital project entails: (a) cleaning and lining watermains on North Main Street, Kelley Boulevard, Bungay Road, Mount Vernon Avenue, Mansfield Road, Lindsey Street (from the city line, north), and Balcom Street, (b) replace ten aged fire hydrants, (c) replace 20 old line gate valves, and (d) and (re)paving. The existing watermains date back to the 1920s and are constructed of unlined cast iron. Although watermains are structurally sound, cleaning and lining them will not only improve water quality for customers in Mansfield, North Attleborough, and other areas north of the city but also reduce the volume of disinfectant used at the Plant. While no additional annual costs are anticipated, the Water Department in fact may realize a reduction in chemical feed as well as a reduction in water usage when flushing to maintain water quality. The relining and cleaning capital project cost is approximately 25% less than replacing the watermains. Project is included City of Attleboro Fiscal Year 2025-2029 Page no 131 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope has not yet been determined. This project is in included in the City's or County's FY 2024 - 2028 Capital Improvement Plan (CIP). As of March 07, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$5,460,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, Attleboro, MA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.