BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Little Rock, Arkansas. Completed plans call for site work for a water / sewer project.

The project consists generally of rehabilitation of 21-inch and 24-inch gravity sewer main through cured-in-place pipe lining (CIPPL), as well as associated manhole installation and rehabilitation, together with incidental and ancillary work. Generally, the scope of work includes approximately 2,950 L.F. of 21-inch and 6600 L.F. of 24-inch sanitary sewer pipe to be rehabilitated through CIPPL, respectively and approximately 24 manhole rehabilitations. Major requirements associated with this project are mobilization, bypass pumping, manhole rehabilitation, CIPPL rehabilitation, and site restoration together with incidental and ancillary work. Contractor's Bid shall be accompanied by a cashier's check or certified check upon a national or state bank in an amount not less than five (5) percent of the total maximum Bid Price, payable without recourse to the Little Rock Water Reclamation Authority, or a Bid Bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a Contract and execute Performance and Payment Bonds within fifteen (15) days after Notice of Award of Contract. The Notice of Award of Contract shall be given by the Owner within sixty (60) days following the opening of Bids. All bids are subject to the conditions of Section 002113 Information for Bidders of the Contract Documents. The successful Bidder must furnish a Performance Bond and Payment Bond upon the forms provided each in the amount of One Hundred (100) Percent of the Contract Price from an approved surety company holding a permit from the State of Arkansas to act as surety, or other surety or sureties acceptable to the Owner. Attention is also called to the requirements of the DBE/MBE/WBE requirements of the contract documents. The Contractor is required to take the affirmative steps to assure that disadvantaged, minority, and woman business enterprises (DBE/MBE/WBE) are used when possible as sources of materials, supplies, equipment, construction activities, and professional services. The apparent low bidder will, as a condition of contract award, be required to document to the Owner and to the Arkansas Natural Resources Commission that affirmative steps were taken in the preparation of bids to obtain DBE/MBE/WBE participation.

Under Construction

Water / Sewer

$2,370,051.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
239
All Active Projects
101
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

July 24, 2023

img_map_placeholder

Multiple Locations, Little Rock, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.