BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Mill Creek, Washington. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project anticipates that the City's Dobson/Remillard/Church/Cook (DRCC) property development moving forward in phases in accordance with recommendations to be developed out of the 2023 Master Plan project (PK00001). It is anticipated that development of the City's property for recreational and similar purposes will necessitate pedestrian improvements along North Creek Drive between the Heather wood Apartments area and the Mill Creek Sports Park/Freedom Field. The street was recently improved with a shared use shoulder along the west side of the street, but the public accessibility needs of a future CIty development here will require established sidewalks, curbs, adequate pedestrian lighting, and similar street improvements on both sides of the street that are not currently present along the length of North Creek Drive adjoining the City property. Due to the topography along the east side of the street, regrading and/or retaining walls may be required to provide sidewalk, pedestrian and street lighting, and related amenities on the north and east side of the street. The south and west sides of the street may require low retaining walls and/or thickened sidewalks as well. Estimates of this project's expenses and potential funding source(s) will need to be updated in a future Capital Improvement Plan, once the Master Plan has been completed and adopted, as particular preferred development plans may require different street improvements. This project scope does not include the storm water conveyance and facility improvements that will be required. That improvement scope is included with an interrelated storm water utility improvement project (SW00006). This project is included in the City of Mill Creek's FY 2023-2028 Capital Improvement Plan (CIP) As of March 15, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$1,400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
89
Bidding Soon
2,299
All Active Projects
704
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2026

img_map_placeholder

N Creek Dr, Mill Creek, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.