BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mill Creek, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project has been updated from a previous capital improvement project described in the 2021-2026 Capital Improvement Plan named EGUV Spine Road West Connection (Phase 1) or EGUV Spine Road (39th Ave SE to 44th Ave SE) (old Project #19-ROAD-15). This project proposes to evaluate options for a future ROW development for a transportation connection following the alignment of 33rd St NE between 41st Ave SE and 44th Ave SE. The original East Gateway Urban Village (EGUV) subarea plan envisioned a Spine Road extending between 39th Ave SE and 44th Ave SE, and part of the ROW needed for this connection was dedicated during approvals of adjacent developments. The remaining ROW acquisition needed still needs to be completed by the CIty and the property owners. However, preliminary design work for the new spine road found it to be very difficult and expensive to address storm water management requirements for a full-width roadway for motorized vehicles. In the meantime, continuing development activities in the area, including the completion of The Farm in 2021, "filled in" part of the original "spine road" (between 39th Ave SE and 41st Ave SE) as a mainly local-access street. This makes a full multi-modal street development largely impractical due to high cost to gain a comparatively small benefit. An alternative as a bicycle/pedestrian shared-use pathway connection is scoped for this project. This alternative would exclude motorized vehicle use, but will substantially reduce the storm water management requirements and the prohibitive costs of a full, multimodal roadway. This project will evaluate local and stakeholder interest in this more cost effective alternative, followed by design and construction in the future. The current design and construction estimate will be amended based on feedback from stakeholders regarding amendities (i.e. benches, trees, etc.) for this 750-foot route. This project is included in the City of Mill Creek's FY 2023-2028 Capital Improvement Plan (CIP) Per the owner, as of March 21, 2023, they have not selected a design team for this project. The owner states that construction for the project has not yet been scheduled. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$790,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
89
Bidding Soon
2,299
All Active Projects
704
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2024

img_map_placeholder

133rd St SE, Mill Creek, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.