Site work and renovation of a water / sewer project in Cedar City, Utah. Working plans call civil work for a water pump station.

As of May 17, 2023, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. Project work includes installation of a new screw press system and feed pump along with the required piping, valving, conduit, and cont \ fsvz The Work includes the installation of equipment that has been prepurchased by the City and construction necessary for a second train of dewatering equipment at the Cedar City Regional Wastewater Treatment Facility. Construction shall include piping, pipe supports, one new solids feed pump, one new screw press system (including polymer feed unit, flocculation tank, air compressor, booster pump, and fan), building HVAC improvements, a new monorail crane system, and associated electrical and instrumentation and control work necessary for a complete, operational system. All questions regarding the Contract Documents shall be emailed to the City's Project Manager, Jonathan Stathis (jstathis@cedarcity.org) and the Project Engineer, Clint Rogers (clint.rogers@stantec.com). Question Deadline 03/16/2023 The Work to be performed under this Contract shall consist of furnishing tools, equipment, materials, supplies, and manufactured articles, and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the Work in good faith shall be provided by the Contractor as though originally so indicated, at no increase in cost to the Owner. A. In general, the principal items of work under this Contract include, but are not necessarily limited to, the following: 1. The expansion of the Cedar City Regional Wastewater Treatment Facility's dewatering train including the installation of a new screw press system and feed pump purchased by the Owner, and the required piping, valving, conduit and controls, and appurtenant work for a complete operable system. 2. Any damage done to any of the existing facilities during the course of construction shall be repaired by the Contractor or applicable Subcontractor and shall be paid for by the Contractor. 3. Provide all temporary services as necessary, such as power, lighting, heating, security and potable water. 4. Assure continuous operation of existing facility during construction, except during times of agreed upon shutdown, and not prevent or hinder access to active areas of the facility. 5. Daily cleanup of the site including the removal of rubbish, scrap and securing of materials/equipment. 6. Federal, state, local or other required permits and approvals as required. It is the responsibility of the Contractor that all work shall met OSHA compliance and any additional safety requirements from the Owner. 7. Concrete work as specified herein or on the Contract Drawings. 8. Working outside of normal business hours is only permitted with the written permission of the Owner. 9. All other work required for a complete and satisfactory operating installation. B. The foregoing description(s) shall not be construed as a complete description of all Work required. C. The Work shall be performed at the Owner's Cedar City Regional Wastewater Treatment Facility, 7218 N 2300 W, Cedar City, Utah.

Final Planning

Water / Sewer

$619,500.00

Public - City

Renovation, Site Work

34

15

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Project Identification, Temporary Project Signage, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Slings, Manufacturing Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Gas Compressors, Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
89
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

November 29, 2023

img_map_placeholder

7218 N 2300 W, Cedar City, UT


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cedar City Regional Wastewater Treatment Facility Dewatering Expansion Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.