BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Lake Grove, New York. Contact the soliciting agency for additional information.

Two-time leaf cleanup of all parks and Village Hall grounds at start of season, and at end of season. First (1st) clean-up to be completed before commencement of grass cutting. (April].Oth) Last clean-up must be done the week before Christmas. (cutting of ornamental grasses) LEAF CLEAN-UP PAID UPON COMPLETION - BOTH - SPRING & FALL A. Cut all grassed areas weekly. (All grass areas to be cut with mulching blades) Contractor to pick (1) day of the week. (Except Village Hall must be done on Thursday or Friday) *i.e. If cut on Thursday - weekly would be every Thursday NO EXCEPTIONS, UNLESS AGREED TO BY SUPT. OF PUBLIC WORKS If cutting is missed $ amount to be subtracted from bill. B. Power edge all curbs weekly. C. Power edge all sidewalks weekly. D. Trim around all playground equipment weekly. F. Hand rake Fiber Mulch in play areas - once in April & once in November. G. Trim all fenced areas weekly. H. Trim all shrubs weekly. I. Weed flowerbeds at Village Hall (as needed) (including by parking lot). J. Weeks of 7-3-23 through 8-4-23 VILLAGE HALL TO BE CUT AFTER 4:30 P.M. HENKE PARK: I. KELLY PARK: A, B, D, F, And G, H. POND PATH PARK: A, B, C, D, F, And G. METZNER PARK: A, B, C, D, F, G, H. VICTOR PARK: A, B, D, F, G, H. *VILLAGE HALL & FRONT OF ADJOINING SUMP: A, B, C, D, H, I. (Includes beds by parking lot) *MUST BE FINISHED PRIOR TO 8:30 A.M. or done after 4:30 P.M., **PARTIAL LEAF REMOVAL AREAS - as follows: Leaf Removal Areas o 1. Entire Parking Lot area including all beds and entrance and exit ways 2. Starting at Parking Lot going south along Pond Path going into Park 50' in depth approximate length - 240' 3. Starting at Parking Lot going north along Pond Path going into asphalt walkway length of Park approximate length - 530' ***ROUTE 347, (Country Pointe) Frontage between Hallock Road & Stony Brook Road 1. Mowing and Hedge Trimming (bi-weekly) The Village of Lake Grove reserves the right to reject and declare invalid any and all bids in the best interest of the Village.

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
212
Bidding Soon
3,977
All Active Projects
1,827
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2023

April 10, 2023

img_map_placeholder

Multiple Locations, Lake Grove, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.