BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Watkinsville, Georgia. Completed plans call for site work for a road / highway.

The Oconee County Board of Commissioners are soliciting bids from contractors interested in providing the installation of a traffic signal at the intersection of Union Church Road and SR 53 as well as the replacement of signal heads along the Oconee Connector & Hog Mountain Road at Daniells Bridge Road/Government Station Road. Contractor must be GDOT pre-qualified. Please see Section III of the ITB documents for full Scope of Work. Hard copies may be delivered to the above address ONLY between the hours of 8:00 AM and 5:00 PM EST, Monday through Friday, excluding holidays observed by the Oconee County Government. Bid must meet required specifications and must be of a quality that will adequately serve the use and purpose for which intended. DESCRIPTION OF WORK All work as described in the Scope of Work is subject to the inspection of the Oconee County Public Works Department. It shall be the Contractor's responsibility to coordinate with the Oconee County Public Works Department for inspection services. 1. Traffic Signal Installation Please refer to included Design Plan (Attachment A) and List of Materials (Attachment B). 2. Signal Head Replacement The signal head replacement project includes the replacement of signal heads and cables at five (5) signals, four (4) on Oconee Connector and one (1) at Hog Mountain Road and Daniells Bridge Road/Government Station Road. Selected Contractor will be responsible for evaluating the existing cabinets at Oconee Connector/Plaza Parkway and Oconee Connector/Parkway Boulevard to determine if the existing cabinet has the capacity for flashing yellow operation. If feasible, the protected left turns at these two intersections will be converted to flashing yellow, protected/permissive operation. Oconee County is currently conducting an ETI to determine if FYA's are feasible and evaluating side street left turn phases. III. SCOPE OF WORK - Contractor agrees to furnish and pay for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment, and services of any kind and type necessary to diligently, timely, and fully perform and complete in a good workmanlike manner the scope of work assigned to the Contractor. - The basic scope of work to be performed under this agreement is to provide the installation of a traffic signal at SR 53 and Union Church Road and signal head/cable replacement at five intersections. - Allsignage and traffic controlshall comply with the latest edition ofthe "Manual of Uniform Traffic Control Devices for Streets and Highways." - All signage to be provided must be high intensity prismatic material. Bid Results Task 1 Lump Sum - Wright Brown Electric - $89000 Task 2 Lump Sum - Moye Electric Company Inc - $52000

Bid Results

Roads / Highways

$141,000.00

Public - County

Site Work

3

5

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
161
Bidding Soon
2,285
All Active Projects
1,067
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 6, 2023

May 8, 2023

June 30, 2023

img_map_placeholder

Multiple Locations, Watkinsville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.