BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Livingston, Tennessee. Completed plans call for the renovation of a educational facility.

This solicitation is for painting services only. Paint will be provided by Tennessee Tech. Contractor will furnish labor, supplies, and equipment to do the work. Tennessee Tech wishes to have the work completed by April 30, 2023. Oakley Farm, 1198 Monterey Highway, Livingston, TN - Painting schedule must be coordinated with Oakley Farm personnel prior to starting job. o Paint to be used is Fence Coat black acrylic lacquer, packaged in 55-gallon drums. o Paint was applied approximately six years ago; this is a re-paint. o Paint will need to be applied to both sides of a board fence. The length of the fence is estimated at 5- 1/2 miles (28,914 linear feet). o A total of 38 drums of paint will be available to Contractor; paint manufacturer states that approximately one (1) gallon of paint is needed for every sixteen running feet. o At the end of each work day, Contractor must clean up work area of all paint drums and/or materials. No paint or material will be left on the job site. In addition, Contractor is responsible for properly and legally disposing of all empty paint drums upon completion of the project.

Bid Results

Educational

$20,444.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
19
Bidding Soon
466
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

April 17, 2023

img_map_placeholder

1198 Monterey Hwy, Livingston, TN

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.