Site work and paving for a civil project in Tipton, Iowa. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
Excavation, Class 10 - 1,561 CY; Subgrade Preparation (12" Thick) - 3,455 SY; Subbase, Modified, 6" Thick - 3,455 SY; Compaction Testing - Lump Sum; Trench Foundation - 50 TON; Trench Compaction Testing - Lump Sum; Storm Sewer, Trenched, PVC, 4" - 30 LF; Storm Sewer, Trenched, 12" - 166 LF; Storm Sewer, Trenched, RCP, 12" - 53 LF; Storm Sewer, Trenched, 15" - 150 LF; Storm Sewer, Trenched, RCP, 15" - 53 LF; Storm Sewer, Trenched, 18" - 372 LF; Removal of Storm Sewer, All Types, <15" - 474 LF; Pipe Apron, Metal or RCP, 12" - 4 EA; Subdrain, Type 1 (Longitudinal Subdrain), 4" Dia. - 1,670 LF; Subdrain Outlets and Connections, CMP or PVC, 4" or 6" - 8 EA; Lower/Relocate Existing Water Service - 5 EA; Intake, SW-501 - 1 EA; Intake, SW-502, 48" Dia. - 2 EA; Intake, SW-503 - 1 EA; Intake, SW-505 - 1 EA; Intake, SW-506 - 1 EA; Intake, SW-512, Case 1, 24" Riser - 5 EA; Manhole Adjustment, Minor - 2 EA; Connection to Existing Intake - 1 EA; Modify Existing Intake - Lump Sum; Pavement, PCC, 7" Thick, C3 or C4 (with Baskets) - 3,058 SY; PCC Pavement Samples and Testing - Lump Sum; Removal of Driveway - 257 SY; Driveway, Paved, PCC, 6" Thick - 337 SY; Driveway, Granular - 45 TON; Pavement Removal - 2,106 SY; Temporary Granular Surfacing - 130 TON; Temporary Traffic Control - Lump Sum; Seeding, Fertilizing, and Mulching - Lump Sum; Warranty - Lump Sum; SWPPP Preparation - Lump Sum; SWPPP Management - Lump Sum; Rip Rap, Class D - 25 TON; Silt Fence or Silt Fence Ditch Check - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Sediment - 250 LF; Silt Fence or Silt Fence Ditch Check, Removal of Device - 250 LF; and Mobilization - Lump Sum. Est. Value - $ 584,456.00 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the City, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of Tipton on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Liquidated damages in the amount of Seven Hundred Fifty Dollars ($750.00) per consecutive working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. The contract shall be fully completed and ready for final payment within 70 working days from written Notice to Proceed. The Notice to Proceed will be issued on or about June 1, 2024. The City of Tipton reserves the right to reject any and all bids.
Bid Results
Water / Sewer
$454,808.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
June 1, 2024
Plum St, Tipton, IA
Related To This Project
Tipton, IA
Bid Date: Apr 04 2023
Tipton, IA
Bid Date: Apr 04 2023
Tipton, IA
Bid Date: Apr 17 2024
Tipton, IA
Bid Date: Nov 16 2021
Tipton, IA
Bid Date: Feb 24 2022
Tipton, IA
Bid Date: Mar 04 2021
Tipton, IA
Bid Date: Mar 31 2020
Tipton, IA
Bid Date: Jan 19 2022
Tipton, IA
Bid Date: Feb 21 2023
Tipton, IA
Bid Date: Feb 21 2023
Tipton, IA
Bid Date: Jun 17 2022
Tipton, IA
Bid Date: Apr 28 2022
Tipton, IA
Bid Date: Feb 05 2020
Tipton, IA
Bid Date: Apr 19 2022
Tipton, IA
Bid Date: Apr 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.