BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a military facility in Madison, Wisconsin. Completed plans call for the construction of a military facility.

A. Project provides for furnishing all labor, material and equipment to perform the work on Project Number XGFG212001 Relocate Vehicle Fueling Station as described herein and shown on the project drawings dated May, 2023. B. The Contractor shall be responsible for all requirements described in the contract documents and all work including that of his Subcontractor(s). Failure to familiarize himself with their requirements will not relieve the Contractor of his responsibility to complete the work. *The fueling station relocation project has been revised and released with a new bid date of April 5th, 2023. Addendum 01 has been uploaded to highlight the major changes to the project that need to be accounted for in the proposal. A new pre-bid walkthrough date has been set for Monday, March 20th, at 10:00 AM. A Question and Answer document is being compiled by the government to address all questions to date and is expected to be released in the near future. Project is to relocate and construct the base's primary Diesel and Mogas Station. The project is anticipated to occur in 4 phases: Phase 1: Construct new fueling station to accept and make provisions for new fueling system. Phase 2: Furnish and install pre-manufactured steel canopy on columns installed under phase 1. Furnish and install lighting and complete full site restoration. Fully commission new fueling system. Phase 3: Deconstruct fueling station 1010. Complete closure requirements Phase 4: Complete asphalt paving and site restoration of both new and deconstructed sites. There are also several options to be included on this project for a variety of work around the base to include roadwork and site furnishings. *Addendum 1 has been released. *Question and Answer #1 document has been provided by the base to address questions asked on the project to date. Please see uploaded Q&A and include information as necessary on your proposals. *Addendum 03 has been uploaded with fuel system clarification and an allowable change to the canopy structure. Also uploaded is Q&A Documents #2 & #3.

Post-Bid

Military

$1,000,000.00

Public - Federal

New Construction, Site Work

23

17

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
52
Bidding Soon
1,074
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

June 5, 2023

img_map_placeholder

3110 Mitchell St, Madison, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.