Renovation of a transportation facility in Atlantic, Iowa. Completed plans call for the renovation of a transportation facility.

ITEM SPEC DESCRIPTION QUANTITY UNITS ESTIMATED QUANTITY 1 C-102-1 Stormwater Pollution Prevention Plan (SWPPP) Preparation, Implementation, and Management LS 1 2 C-105-1 Mobilization LS 1 3 C-105-2 Traffic Control LS 1 4 L-101-1 Remove Existing Airport Rotating Beacon EA 1 5 L-101-2 Install Owner-Furnished L-801A Airport Rotating Beacon EA 1 6 L-103-1 Remove Structural Beacon Tower and Concrete Foundation EA 1 7 L-103-2 Furnish and Install L-103 Airport Beacon Tip-Down Pole and Concrete Foundations EA 1 8 L-108-1 L-824 No. 8 AWG, 5 kV, Type C Cable, Installed in Conduit LF 10,600 9 L-108-2 No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Installed in Trench Including Grounding Rods LF 8,300 10 L-109-1 Disconnect, Remove, and Store Existing 15 kW Constant Current Regulator (CCR) EA 1 11 L-109-2 Disconnect, Move, and Reconnect Existing 7.5 kW Constant Current Regulator (CCR) EA 1 12 L-109-3 Furnish, Install, and Connect L-828 15 kW Constant Current Regulator (CCR) with Stacking Kit EA 1 13 L-109-4 Remove and Replace L-854 Radio Controller and Antenna EA 1 14 L-110-1 Non-Encased Schedule 40 Electrical Conduit, 1-Way 2 inch C LF 8,400 15 L-110-2 Directionally Bored Schedule 80 PVC Electrical Conduit, 1-Way 2 inch C LF 650 16 L-115-1 L-867 Electrical Junction Box EA 9 17 L-125-1 Remove Stake-Mounted Runway and Taxiway Edge Light Fixtures & Transformers EA 76 18 L-125-2 Remove Runway End Identifier Light System and Concrete Foundations EA 2 19 L-125-3 L-861(L) Elevated Runway Edge Light Fixture (MIRL) on L-867 Base w/XFMR EA 27 20 L-125-4 L-861T(L) Elevated Taxiway Edge Light Fixture (MITL) on L-867 Base w/XFMR EA 24 21 L-125-5 L-861E(L) Elevated Threshold Light Fixture (MIRL) on L-867 Base w/XFMR EA 18 22 L-125-6 L-849(L) Style E Runway End Identifier Light (REIL) System EA 2 Remove and replace airfield lighting distribution system for Runway 12/30 and connecting taxiway. The project includes base-mounted edge and threshold lighting, new conduit and conductors, horizontal directional drilling, home run to electrical shop, and one new Constant Current Regulator (CCR). The project also includes replacing the airport's structural beacon tower with a tip-down pole, replacing a radio controller and antenna, and replacing the Runway 2/20 Runway End Identifier Light (REIL) systems. The work under the contract shall commence within ten (10) days upon issuance of a written "Notice-to-Proceed", and work shall be substantially complete on or before November 17, 2023 and ready for final payment on or before March 29, 2024 for the base bid. Milestone Phase II - The Runway 2/20 closure during Phase 2 must not exceed 14 calendar days. The proposed start date must be communicated and approved by the Airport Manager at least 30 calendar days prior to the closure. All work shall be substantially completed within the stated timeframe. The earliest date for a Notice-to-Proceed is anticipated about June 5, 2023 (subject to FAA discretion). No runway or taxiway closures will be allowed prior to Tuesday, September 5th, 2023. Work that does not require runway or taxiway closures may occur prior to September 5th, 2023.

Award

Transportation Terminals

$355,259.00

Public - City

Renovation

20

11

12

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
49
Bidding Soon
706
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

June 5, 2023

img_map_placeholder

59706 Airport Road, Atlantic, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.