Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Atlantic, Iowa. Completed plans call for the renovation of a transportation facility.
ITEM SPEC DESCRIPTION QUANTITY UNITS ESTIMATED QUANTITY 1 C-102-1 Stormwater Pollution Prevention Plan (SWPPP) Preparation, Implementation, and Management LS 1 2 C-105-1 Mobilization LS 1 3 C-105-2 Traffic Control LS 1 4 L-101-1 Remove Existing Airport Rotating Beacon EA 1 5 L-101-2 Install Owner-Furnished L-801A Airport Rotating Beacon EA 1 6 L-103-1 Remove Structural Beacon Tower and Concrete Foundation EA 1 7 L-103-2 Furnish and Install L-103 Airport Beacon Tip-Down Pole and Concrete Foundations EA 1 8 L-108-1 L-824 No. 8 AWG, 5 kV, Type C Cable, Installed in Conduit LF 10,600 9 L-108-2 No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Installed in Trench Including Grounding Rods LF 8,300 10 L-109-1 Disconnect, Remove, and Store Existing 15 kW Constant Current Regulator (CCR) EA 1 11 L-109-2 Disconnect, Move, and Reconnect Existing 7.5 kW Constant Current Regulator (CCR) EA 1 12 L-109-3 Furnish, Install, and Connect L-828 15 kW Constant Current Regulator (CCR) with Stacking Kit EA 1 13 L-109-4 Remove and Replace L-854 Radio Controller and Antenna EA 1 14 L-110-1 Non-Encased Schedule 40 Electrical Conduit, 1-Way 2 inch C LF 8,400 15 L-110-2 Directionally Bored Schedule 80 PVC Electrical Conduit, 1-Way 2 inch C LF 650 16 L-115-1 L-867 Electrical Junction Box EA 9 17 L-125-1 Remove Stake-Mounted Runway and Taxiway Edge Light Fixtures & Transformers EA 76 18 L-125-2 Remove Runway End Identifier Light System and Concrete Foundations EA 2 19 L-125-3 L-861(L) Elevated Runway Edge Light Fixture (MIRL) on L-867 Base w/XFMR EA 27 20 L-125-4 L-861T(L) Elevated Taxiway Edge Light Fixture (MITL) on L-867 Base w/XFMR EA 24 21 L-125-5 L-861E(L) Elevated Threshold Light Fixture (MIRL) on L-867 Base w/XFMR EA 18 22 L-125-6 L-849(L) Style E Runway End Identifier Light (REIL) System EA 2 Remove and replace airfield lighting distribution system for Runway 12/30 and connecting taxiway. The project includes base-mounted edge and threshold lighting, new conduit and conductors, horizontal directional drilling, home run to electrical shop, and one new Constant Current Regulator (CCR). The project also includes replacing the airport's structural beacon tower with a tip-down pole, replacing a radio controller and antenna, and replacing the Runway 2/20 Runway End Identifier Light (REIL) systems. The work under the contract shall commence within ten (10) days upon issuance of a written "Notice-to-Proceed", and work shall be substantially complete on or before November 17, 2023 and ready for final payment on or before March 29, 2024 for the base bid. Milestone Phase II - The Runway 2/20 closure during Phase 2 must not exceed 14 calendar days. The proposed start date must be communicated and approved by the Airport Manager at least 30 calendar days prior to the closure. All work shall be substantially completed within the stated timeframe. The earliest date for a Notice-to-Proceed is anticipated about June 5, 2023 (subject to FAA discretion). No runway or taxiway closures will be allowed prior to Tuesday, September 5th, 2023. Work that does not require runway or taxiway closures may occur prior to September 5th, 2023.
Award
Transportation Terminals
$355,259.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2023
June 5, 2023
59706 Airport Road, Atlantic, IA
Related To This Project
Atlantic, IA
Bid Date: Mar 29 2023
Atlantic, IA
Bid Date: Apr 25 2023
Atlantic, IA
Bid Date: Dec 11 2023
Atlantic, IA
Bid Date: Jun 27 2023
Atlantic, IA
Bid Date: Jul 12 2023
Atlantic, IA
Bid Date: Jul 12 2023
Atlantic, IA
Bid Date: Sep 14 2021
Atlantic, IA
Bid Date: Dec 27 2021
Atlantic, IA
Bid Date: Mar 07 2023
Atlantic, IA
Bid Date: Aug 16 2022
Atlantic, IA
Bid Date: Jan 18 2023
Atlantic, IA
Bid Date: Sep 20 2022
Atlantic, IA
Bid Date: Aug 18 2022
Atlantic, IA
Bid Date: Feb 23 2022
Atlantic, IA
Bid Date: Aug 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.