Published April 27, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Denver, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

The project generally consists of the installation of three (3) new raw sewage pumps and a new triplex pump control panel at the Adamstown Borough Wastewater Treatment Plant as specified and indicated on the Contract Drawings. CLARIFICATION DEADLINE 3/31/2023 12:00 PM All bidders must submit bid security in the amount of ten percent [10%]. All Contracts exceeding $10,000.00 shall be performed in compliance with Executive Order 11246, entitled, "Equal Employment Opportunity," as amended by Executive Order 11375 and as supplemented in Department of Labor regulations (41 CFR Part 60). In addition, all Contractors shall comply with the "Nondiscrimination/Sexual Harassment Clause" as required by Pennsylvania Executive Order 2016-05. Performance financial security and payment financial security, each in an amount equal to 100% of the contract price in form set forth in the Project Manual, and evidence of all required insurance as set forth in the Bidding Documents, must be furnished by the successful Bidder at the time set forth in the project manual. In the event that the successful Bidder proposes to furnish a lending institution letter of credit or a restrictive lending institution escrow account as performance and payment financial security rather than performance and payment surety bonds, the form and content of such alternative financial security must be in compliance with Pennsylvania law, fully protect the public and be approved by the Owner's solicitor. Bidders are advised that each Bidder is required to submit, with their Bid, a Non- Collusion Affidavit in the form contained in the bidding documents in accordance with the Pennsylvania Anti-Bid Rigging Act. The wages paid on this project will be subject to the Pennsylvania Prevailing Wage Act approved August 15, 1961, P.L. 987 as amended and supplemented. The Pennsylvania Human Relations Act of 1955, P.L. 744, No. 222, as amended June 25, 1997, by Act 34 of 1997, 43 P.S. 951-963, shall apply to this contract. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on this project, and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. The Bidder and all subcontractors must be qualified for the type of project work specified in order to bid the project, and prequalification's must be submitted by the Bidder and all subcontractors. The qualification documentation listed in Article 3 in the Instructions to Bidders must be submitted with the bid Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with prevention of environmental pollution and the preservation of public, natural resources that affect the project. Any Bid received after the time and date specified shall not be considered. Owner shall award the Contract to the lowest responsive and responsible Bidder or shall reject all Bids within sixty (60) days of the date of the bid opening, and no Bidder may withdraw his Bid before the expiration of such sixty (60) day period; provided, however, if the award of contracts is delayed by required approval of another government agency, the sale of bonds or the award of a grant or grants, the Owner shall reject all bids or award the Contract to the lowest responsive and responsible Bidder within one hundred twenty (120) days of the date of Bid opening, and in such event no Bidder may withdraw his Bid before the expiration of such one hundred twenty (120) day period. Extensions of the date for the award of the Contract may be made by the mutual written consent of the Owner and the lowest responsive and responsible Bidder. The Owner reserves the right, at its option, to waive any informalities, irregularities, defects, errors or omissions in any or all proposals and to reject any or all proposals. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof.

Award

Water / Sewer

$103,400.00

Public - City

Renovation

10

17

11

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
151
Bidding Soon
2,171
All Active Projects
1,041
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

May 3, 2023

img_map_placeholder

235 E Swartzville Rd, Denver, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Raw Sewage Pump Replacement Project - Contract A - General/Mechanical and Contract B - Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.