Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Bremerton, Washington. Completed plans call for site work for a water / sewer project.
**As of April 21,2023, project was awarded to Insituform - Sammamish, awarded amount is $1,376,536.42.** The WORK must be completed within 135 calendar days of the date of issuance of the Notice to Proceed. The Notice to Proceed is anticipated to be issued on or around May 3, 2023 The WORK includes rehabilitating sanitary and storm sewer pipes by cure-in-place pipe (CIPP) methods AND the cleaning and video inspection of sanitary and storm sewer pipes in support of future lining projects. SCHEDULE A: The WORK to be completed includes: - The video inspection and cleaning of approximately 13,300 linear feet of sanitary sewer pipe. AND - Rehabilitating approximately 8,000 linear feet of sanitary sewer pipe using heat-cured or ultra-violet (UV) CIPP methods, reinstating side sewers and removing protruding laterals. Heat-cured CIPP lining methods shall only use styrene-free resin. SCHEDULE B: The WORK to be completed includes: - The video inspection and cleaning of approximately 3,500 linear feet of storm sewer pipe AND - Rehabilitating approximately 3,500 linear feet of storm sewer pipe using the heat-cured or UV CIPP method and reinstating side sewers and removing protruding laterals. Heat-cured CIPP lining methods shall only use styrene-free resin. The Work for both schedules also includes installing flow diversion and temporary bypass pumping, temporary traffic control, and all other work as identified in the Contract Documents. A portion of the work must be performed at night since the project route is along several principal arterials. ESTIMATE: $1,050,000 - $1,600,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. The failure to furnish a bid deposit of a minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. The successful bidder will also be required to provide a Performance Bond for 100 percent of the Contract Price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. All communications related to the project shall be written and directed to the City prior to opening of Bids: Nick Ataie, P.E. nick.ataie@ci.bremerton.wa.us The City of Bremerton reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most satisfactory and responsible bidder and shall be the sole judge thereof.
Award
Water / Sewer
$1,376,536.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2023
May 15, 2023
Multiple Locations, Bremerton, WA
Related To This Project
Bremerton, WA
--
Bremerton, WA
Bid Date: Mar 28 2023
Bremerton, WA
Bid Date: Apr 20 2023
Bremerton, WA
Bid Date: Apr 19 2023
Bremerton, WA
Bid Date: May 03 2023
Bremerton, WA
Bid Date: Feb 27 2019
Bremerton, WA
Bid Date: Jul 21 2021
Bremerton, WA
Bid Date: Mar 24 2023
Bremerton, WA
Bid Date: Mar 23 2023
Bremerton, WA
Bid Date: Mar 02 2023
Bremerton, WA
Bid Date: Mar 07 2023
Bremerton, WA
Bid Date: Feb 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.