EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a medical facility in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a medical facility.

Questions Due Date: Mar 27th 2023, 3:00 PM EDT Questions received after this date and time may not be answered by the County. All questions must be submitted through Bonfire Project Description: This is a project to upgrade the TekAir system for the medical examiner's office. Without intending to limit or restrict the volume of work required by this Specification and the applicable drawings, the work generally consists of: 1. Verify existing control sequences of the lab systems. Verify valve airflow values, space temperatures, supply and exhaust airflow offsets. 2. Provide Method of Procedures for the demolition and new work for the various lab spaces. 3. Remove and reinstall ceiling tiles as needed to perform work above ceilings. 4. Remove existing TekAir lab controls including air valve controllers, lab controllers, fume hood controls, space thermostats, and various sensors. 5. Remove TekAir lab controls network from lab spaces back to BAS. 6. Disconnect control wiring and power wiring from existing lab control system and fume hood controls. Power and control wiring not used shall be removed. 7. Existing air valves shall remain. a. If a valve is deemed inoperable, contractor shall remove existing valve install new valve. b. Cost to remove existing valve and furnish and install new valves shall be provided as a separate bid cost from Base Bid. Provide a replacement bid price for each valve model and size. Refer to valve schedules for existing valve models and sizes. Valve models and sizes to be verified in the field. c. Refer to 15871 Laboratory Airflow Control System for valve requirements. 8. Existing damper actuators and hot water coil control valves shall remain. a. If an air valve damper actuator is not operating properly, contractor shall remove actuator and install new. b. If a hot water coil control valve and/or associated actuator is not operating properly, contractor shall remove valve and actuator and install new to match existing performance requirements. c. Cost to remove damper actuators and hot water coil control valves and furnish and install new damper actuators and hot water coil control valves shall be provided as a separate bid cost from Base Bid. Provide a typical bid price for actuator replacement or control valve replacement. Refer to 15950 Automatic Temperature Controls for actuator and control valve requirements. 9. Furnish and install new lab controls including air valve controllers, lab controllers, fume hood controls, space thermostats, and various sensors. 10. Provide equipment and wiring to provide a complete lab control system which shall be accessible at the existing workstation and remotely via a web browser. 11. Provide hardware and software including system graphics and programming to accommodate new lab controls. 12. Provide new equipment labels. 13. Provide supplemental supports for new control cabinets/enclosures. 14. Provide protection of lab equipment as directed by the Allegheny County Medical Examiner's Office representative. 15. Patch/seal holes in fire rated walls and floors to maintain proper fire rating. 16. Provide testing, balancing and adjusting. 17. Provide access doors in ceiling system where required. 18. Provide fire sealing at all openings around pipe and conduit penetrations through fire rated walls and floors. 19. Provide operating and maintenance instructions and manuals. 20. Provide demonstration of successful operation of the lab systems and fume hood controls. 21. Provide training for systems operations.

Bid Results

Medical

$985,587.00

Public - County

Renovation

21

12

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work Covered by Contract Documents, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Temporary Barriers and Enclosures, Temporary Fencing, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Enclosed Bus Assemblies, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
107
Bidding Soon
1,003
All Active Projects
472
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

May 5, 2023

img_map_placeholder

1520 Penn Ave, Pittsburgh, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Medical Examiner's Office TekAir Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.