Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Hollister, Missouri. Completed plans call for site work for a transportation facility.
Furnishing all labor, materials, equipment and performing all work necessary to remove existing REILs and replace with new LED REILs on Runway 12 and 30, remove existing taxiway edge lights and replace with retroreflective markers, remove existing windcone and replace with new LED windcone, and remove and replace airport beacon on existing tower. Contract Work Items. This project includes, but is not limited to, removal of stake mounted edge lights, installation of retroreflective markers, electrical vault modifications, wind cone and segmented circle removal and replacement, airport beacon removal and replacement, removal and replacement of runway REIL systems, and associated electrical items. Contract Time. The owner has established a contract performance time of 25 calendar days from the date of the Notice-to-Proceed. All project work shall be substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed in the project manual. Bid Security. No bid will be considered unless accompanied by a certified check or cashier's check on any bank or trust company insured by the Federal Deposit Insurance Corporation, payable to Taney County, for not less than five (5) percent of the total amount of the bid, or by a bid bond secured by an approved surety or sureties, payable to the owner, for not less than five (5) percent of the total amount of the bid. Bonding Requirements. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price at the time of contract execution. Award of Contract. All proposals submitted in accordance with the instructions presented herein will be subject to evaluation. Bids may be held by the Taney County for a period not to exceed 90 Days from the date of the bid opening for the purpose of conducting the bid evaluation. Award of contract will be based on the lowest aggregate sum proposal submitted from those bidders that are confirmed as being responsive and responsible. If more than one base bid is listed in the Proposal Form, the bidder shall bid on Base Bid and Additive Alternates. The owner reserves the right to select any one of the combinations of the base bid(s) and alternate bid(s), which in the judgment of the owner, best serves the owner's interest. The right is reserved, as the Taney County may require, to reject any bid and all bids. Every request for such an interpretation shall be made in writing to Garver by email to Quinton Smith (qdsmith@garverusa.com) Any inquiry received forty-eight (48) hours prior to the opening of bids will be given consideration
Award
Transportation Terminals
$416,050.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2023
June 16, 2023
491 Blue Sky Ln, Hollister, MO
Related To This Project
Hollister, MO
Bid Date: Jul 31 2023
Hollister, MO
--
Hollister, MO
Bid Date: Dec 11 2023
Hollister, MO
Bid Date: Feb 02 2024
Hollister, MO
Bid Date: Mar 01 2024
Hollister, MO
Bid Date: Apr 10 2024
Hollister, MO
Bid Date: May 06 2024
Hollister, MO
Bid Date: May 29 2024
Hollister, MO
Bid Date: Aug 15 2022
Hollister, MO
Bid Date: Apr 27 2021
Hollister, MO
Bid Date: Apr 15 2022
Hollister, MO
Bid Date: Nov 21 2022
Hollister, MO
Bid Date: Nov 16 2022
Columbia, MO
Bid Date: Mar 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.