BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Chipley, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for outdoor lighting for a road / highway; bridge / tunnel; water / sewer project; sidewalk / parking lot; sidewalk / parking lot; and for the construction of a bridge / tunnel.

Counties: Washington Road Name: SR 77 Limits: From N of Rogers Rd to S of Cane Mill Rd Project(s): 21790965201(*) Federal Aid No: D322007B Project(s): 21790965603 Federal Aid No: D322007B Total Roadway Length: 3.469 Miles Contract Days: 1150 Total Bridge Length: 0.012 Miles Total Proposal Length: 3.481 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Standard For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. The improvements under this contract consist of the reconstruction of SR 77 from north of Rogers Road to just south of Cane Mill Road for a distance of 3.481 miles in Washington County. The work under FPID 217909-6-52-01 includes widening the existing two-lane roadway to a four-lane divided typical section north and south of the Town of Wausau. The new four-lane rural typical section will consist of two 12-foot travel lanes in each direction separated by a 40- foot depressed median and 10-foot outside shoulders, 5-foot paved. Generally, within the Town of Wausau the typical section will transition to a five-lane undivided urban typical section with 6-foot sidewalks along each side. Stormwater ponds and improved roadside ditches, outfalls, side drains, culverts and inlets are included in the construction. Constructing two new bridges (Bridge Nos. 610167 and 610168) over Reedy Creek north of Wausau replacing existing bridge culvert ID 610011 and a new bridge (Bridge No. 614170) over Reedy Creek on Finch Circle to replace the existing concrete box culvert are included in the work. The work under FPID 217909-6-56-03 includes the replacement of the existing 6" water main with a new 8" water main for the Town of Wausau. Included in this will be constructing the new water main while maintaining service to residents and businesses along the corridor. New service connection under the new roadway and resetting meters will be required. The new water main starts just north of Barbrich Road and will extend north of Bonnie Lane where it currently ends to the new alignment of Finch Circle where it will reconnect to an existing 6"water main, approximately 2.4 miles. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Add Lanes and Reconstruct

Award

Roads / Highways

$55,853,437.00

Public - State/Provincial

New Construction, Outdoor Lighting, Paving, Site Work

826

5

11

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
16
Bidding Soon
318
All Active Projects
140
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

July 17, 2023

img_map_placeholder

FL-77, Chipley, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.