BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ocala, Florida. Completed plans call for site work for a water / sewer project.

Marion County Office of the County Engineer is seeking qualified contractors to retrofit the bottoms of two (2) drainage retention areas (DRAs) with Bold & Gold soil amendment. Bid Bond 5% Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. Marion County believes that hiring done through this contract should, to the maximum extent, be offered to citizens within its boundaries that are unemployed or seeking work for the first time. To that extent, the firm awarded business under this contract will be contacted by the Workforce Connection, our regional workforce development board, to discuss hiring through its staff and services. Your participation with Workforce Connection is not required as a condition of award, but rather an opportunity for greater support for the community and your firm in hiring assistance. For questions relating to this bid, contact: Tika Black | tika.black@marionfl.org Question Deadline 03/30/2023 at 12:00 PM ET This project consists of earthwork reshaping, installation of infrastructure improvements and placing Bold & Gold CTS Filtration Media in the bottom of DRAs 7322 and 7403 per the attached plans and specifications. Marion County (Grantee) will construct stormwater retrofits for two drainage retainage areas (DRAs) located in Silver Springs Shores Units 29 & 30 within the PFA of the Silver Springs BMAP. The stormwater retrofits will include the installation of Bold & Gold biosorption activated media that will promote denitrification and result in nutrient removal from the infiltrated stormwater runoff. The Project will also include improvements to the associated stormwater conveyance systems to ensure stormwater runoff is captured in the DRAs as designed. The DEP Grant Funds associated with this Agreement were awarded based on local contributions pledged towards the total project costs: $795,472.06 from Marion County. A summary of the local contributions will be required in the Final Quarterly Progress Report, and financial supporting documentation shall be provided upon request.

Bid Results

Water / Sewer

$870,638.00

Public - County

Site Work

4

7

5

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
58
Bidding Soon
1,223
All Active Projects
527
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2023

May 10, 2023

img_map_placeholder

Multiple Locations, Ocala, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.