Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Rockford, Illinois. Contact the soliciting agency for additional information.
The City of Rockford (hereafter 'City') is requesting proposals from qualified vendors to develop an Urban Forestry Management Plan and perform tree inventory services located within City right of way's (ROW). The City, located in Winnebago County, last conducted a tree inventory roughly ten years ago. There are 750 miles of roadway throughout the City and an estimated 40,000 trees. In recent years, with increased plantings and removals following the devastation of Emerald Ash Borer (EAB), as well as newly acquired parcels and roadways, the City wishes to reassess right of way inventory needs. The City seeks to develop an up to date comprehensive Urban Forest Management plan therefore, following best management practices and industry standards, the City is seeking proposals from qualified firms to conduct a comprehensive tree inventory and, with the information collected, create and deliver an Urban Forest Management Plan. The following RFP sets out the location, scope, and requirements of a contractor to complete the work. Bidder's Questions, Requests for Clarification, & Changes (no later than) 3/20/2023 The contractor shall conduct a GPS/GIS inventory of all trees and open planting spaces within the City-owned right-of-way and managed areas within the corporate boundaries of the City, for the maximum amount of trees and planting spaces attainable within the budgetary restrictions of this grant. The work performed under this contract shall consist of furnishing all labor, machinery, tools, materials, and equipment necessary to complete this right-of-way tree inventory, within the specified timeframe and in a professional manner. Upon completion of the inventory, a plan reflective of the data found during the inventory and industry best management practices will be submitted. At a minimum, the plan will consist of the following: 1. Introduction and background 2. Urban forestry program evaluation and assessment 3. Tree assessment results and summary a. Extrapolated from inventory data 4. Tree management recommendations 5. Work management plan and budget 6. Summary and conclusion The contractor shall use a GIS-based data collection system and the data must conform to the City's existing tree inventory schema and GIS infrastructure. All data must be delivered to the City in Microsoft Excel and ESRI shapefile formats. Tree data collected for this project shall not be maintained in a separate tree inventory software package. Additional deliverables will include digital maps of the designated tree population, a statistical analysis of overall tree population, and implementation of field-ready maps, management plan, and applications on the City's existing GIS infrastructure, which can be accessed from any desktop or mobile device.
Post-Bid
Conservation and Development
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2023
April 27, 2023
Multiple Locations, Rockford, IL
Related To This Project
Rockford, IL
Bid Date: Mar 30 2023
Rockford, IL
Bid Date: Apr 04 2023
Rockford, IL
Bid Date: Apr 07 2023
Rockford, IL
Bid Date: Apr 11 2023
Rockford, IL
Bid Date: Mar 30 2023
Rockford, IL
Bid Date: Mar 16 2023
Rockford, IL
Bid Date: Apr 06 2023
Rockford, IL
Bid Date: Mar 31 2023
Rockford, IL
Bid Date: Mar 30 2023
Rockford, IL
Bid Date: Jun 30 2023
Rockford, IL
Bid Date: Mar 15 2023
Rockford, IL
Bid Date: Mar 10 2023
Rockford, IL
Bid Date: Mar 10 2023
Rockford, IL
Bid Date: Mar 28 2023
Rockford, IL
Bid Date: May 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.