BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Maryville, Missouri. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The Owner or Designer shall give all orders and directions contemplated under this Contract. In general, the Designer shall provide directions relative to the scope of the work and shall give the initial interpretation of the Construction Documents; provided, however, notwithstanding anything to the contrary, the Contractor shall be responsible for the manner, means, methods, and all other matters relating to performance of the Work. During progress of the Work, the Owner will be represented at the project site by the Owners Representative and/or Designer. The Owner and Designer shall at all times have access to the work whenever it is in preparation or progress. The Contractors shall provide proper facilities for such access and for inspection and observation of the Work. All materials and workmanship used in the work shall be subject to the inspection of the Designer and Construction Representative, and any work which is deemed defective shall be removed, rebuilt or made good immediately upon notice. The cost of such correction shall be borne by the Contractor. Contractor shall not be entitled to an extension of the contract completion date in order to remedy defective work. All rejected materialsshall be immediately removed from the site of the work. If Contractor fails to proceed at once with the correction of rejected defective materials or workmanship, the Owner may, by separate contract or otherwise, have the defects remedied or rejected. Materials removed from the site charge the cost of the same against any monies which may be due the Contractor, without prejudice to any other rights or remedies of the Owner. Failure or neglect on the part of Owner or Designer to observe faulty work, or work done which is not in accordance with the Construction Documents shall not relieve the Contractor from responsibility for correcting such work without additional compensation

Award

Municipal

$1,958,500.00

Public - State/Provincial

Demolition, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
32
Bidding Soon
530
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

April 24, 2023

img_map_placeholder

W 16th St & College Park Dr, Maryville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.