Site work and paving for a mixed-use development in Schaumburg, Illinois. Completed plans call for site work for a educational facility; and for paving for a educational facility.

Bids received after designated time and date of bid opening shall not be con-sidered. Scope of work includes sealcoating and striping at multiple locations during summer 2023 and 2024. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. Bidders must submit the original and one copy of the completed bid on or before the specified closing time in an opaque sealed envelope, clearly marked SEALED BID - SUMMER 2023 & 2024 SEALCOATING and addressed to: Debbie Budz Purchasing/ Facility Usage Supervisor Schaumburg School District 54 524 E. Schaumburg Road Schaumburg, IL 60194 The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in-formalities in bidding. It is the policy of Schaumburg Community Consolidated School District 54 to provide equal opportunity to all qual-ified businesses in the awarding of contracting and accordingly promotes the utilization of diversified businesses to the maximum extent feasible in any contract issued against this solicitation to bid. All Bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all contractors working on public works. The Bidder shall have a written sexual harassment policy in place in full compliance with Section 2-105 of the Illi-nois Human Rights Act. QUALIFICATION: Each Bidder must satisfactorily complete the qualification process described in Section 010000-General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid. Contents of each Bidder's Qualification Documents will be available for public review. The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Failure to attend the pre-bid conference shall result in the rejection of any bids submitted by those non-attending bidder/contractors. The company name registered must be the same as that of the company submitting the quotations.

Award

Educational

$441,960.00

Public - City

Paving, Site Work

44

18

5

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Roof Tiles
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
129
Bidding Soon
2,758
All Active Projects
1,239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

June 7, 2023

img_map_placeholder

Multiple Locations, Schaumburg, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Summer 2023 & 2024 Sealcoating at multiple School District

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.