BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Manhattan, Kansas. Completed plans call for the renovation of a educational facility.

The Cage and Rack Washer will replace an existing pit-mounted two-door pass-thru unit. The Cage and Bottle Washer will replace an existing floor mounted two door pass-thru unit. Delivery, installation and local startup is requested for both units. Item A: Cage and Rack Washer Requirements for a steam heated unit with incoming water approximately 120F o Approximate Interior Cabinet Size: 48" wide by 88" high by 90" long o Two door pass-thru o Service enclosure/trim and door fascia only required on dirty side o Controls to be located on the right side of the unit's dirty side o Existing wall opening is approximately 83" wide by 101" high o Pit mounted o See attached drawing of existing pit o 480V 3-phase, 60Hz o Steam coil sump heating o Data stored on removeable flash memory o Interlocking doors o Bottle washing capabilities o Bottle wash cart with manifold wash system o Floor connection and docking inside cabinet o Exhaust fan to supplement building exhaust o Acid and Alkaline detergent chemical storage tanks o Interior emergency stop system o Delivery & installation o Local startup Item B: Cage and Bottle Washer Requirements for a steam heated unit with incoming water approximately 120F o Approximate interior cabinet size: 48" wide by 30" high by 34" deep o Two door pass-through o Existing wall opening is approximately 60" wide by 87" high o Floor mounted o 480V 3-phase, 60Hz o Data stored on removeable flash memory o Alkaline and Acid compatible o Steam coil sump heating o Any accessories/options required for bottle/cage washing o Delivery & installation o Local startup The Cage and Rack Washer will replace an existing pit-mounted two-door pass-thru unit. The Cage and Bottle Washer will replace an existing floor mounted two door pass-thru unit. Delivery, installation and local startup is requested for both units. o Separate mobilization fees are required as the department will not take both units offline at the same time. o Installation documents must be sent out within two (2) weeks of bid being awarded. System. o Both Washers to be installed and ready for final inspection by December 29, 2023. Project Manager: Ryan Zecha rzecha@ksu.edu Bid Result Item 1 - Innovative Laboratory Systems - $134,795 Item 2 - Innovative Laboratory Systems - $46,747

Bid Results

Educational

$181,542.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
239
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2023

April 24, 2023

img_map_placeholder

1620 Denison Ave, Manhattan, KS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.