EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Mahnomen, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of 05/09/2023 Awarded with $4,544,315.01 A minimum goal of 10.5 % Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises. A certified check or a corporate surety bond, made payable to the Treasurer of Le Sueur County, must accompany bids in an amount of not less than five percent (5%) of total bid. Construction End Date:09/29/2023 Expected Award Date:04/18/2023 The County Board reserves the right to reject any or all bids and to waive any defects therein. Direct questions about this Project, including pre-bid questions, to Nathan Olson at 507-357-8211 and nolson@co.le-sueur.mn.us. These provisions shall apply to this contract, which is funded in whole or in part with federal funds9 and state funds.10 6 Minnesota Rules 5200.1106, Subpart 5(C) 7 Minnesota Rules 5200.1106, Subpart 7(C) 8 Minnesota Rules 5200.1106, Subpart 7(B) 9 29 CFR Part 5.5(a) 10 Minnesota Statute 177.41 11 Minnesota Statute 177.44, Subdivision 1 12 29 CFR Part 5.5(a)(6) 13 Minnesota Statute 177.44, Subdivision 5 B. These provisions shall apply to the prime contractor and all subcontractors contracting to do all or part ofthe work under this contract.11 C. The provisions established in this document do not necessarily represent all federal, state, and local laws, ordinances, rules and regulations. It is the responsibility ofthe prime contractor to inform itself and all subcontractors about other regulations that may be applicable to this contract. D. The prime contractor is responsible to ensure that each subcontractor performing work under this contract receives copies of all required contract provisions. These provisions shall be incorporated into written subcontracts and must be displayed on the poster board. 12 13 E. The department shall administer this contract in accordance with all applicable federal regulations, state statutes and rules , along with the plans, specifications and provisions, which are incorporated into and found elsewhere in this contract

Award

Roads / Highways

$4,544,315.00

Public - County

Paving, Site Work

9

12

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
3
Bidding Soon
244
All Active Projects
74
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Mahnomen, MN

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Mill, Stabilized Full Depth Reclamation, Bituminous Overlay Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.