BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Santa Maria, California. Completed plans call for the renovation of a transportation facility.

The work comprises the furnishing of all labor and materials for the NEW SINGLE PLY MEMBRANE ROOF SYSTEM OVER THE EXISTING METAL PANEL ROOF, AT 3001 AIRPARK DRIVE, Santa Maria Public Airport. Each proposal must be accompanied by a certified or cashier's check, or by a corporate surety bond on the form furnished by the District, as a guarantee that the bidder will, if award is made to it in accordance with the terms of its proposal, promptly secure worker's compensation insurance and liability insurance, execute an agreement in the required form, and furnish satisfactory bonds for faithful performance of the contract and for payment of claims of material suppliers and laborers hereunder. Said check or bid bond shall be in an amount not less than ten percent (10%) of the amount of the bid. The faithful performance bond shall be not less than one hundred percent (100%) of the contract price, and the payment bond shall be not less than one hundred percent (100%) of the contract price. The minimum wages to be paid for labor shall be not less than the general prevailing per diem wage and rates for overtime and general holidays as determined by the director of the Department of Industrial Relations, State of California, pursuant to California Labor Code Sections 1770, 1773, and 1773.1, which wage rates are available for inspection at the District office. The Work shall be commenced on a floating date as determined by the Contractor and agreed to by the District either on or after the date stated in the District's Notice to Proceed. Once the Contractor has commenced work, he shall continue the work consecutively for no more than 45 calendar days to substantially complete work and no later than May 15, 2023, whichever occurs first. Once Contractor commences work a reasonable allowance for the time during which Contractor is delayed in said work by the acts or neglect of District or its employees or those under District by contract or otherwise, or by acts of God which Contractor could not have reasonable foreseen and provided against, or by storm and inclement weather which delay the work, or by any strikes, boycotts, or like obstructive action by employee or labor organizations or any general strike, or by organization of employees, shall be added to the aforesaid time for completion. In view of thedifficulty to ascertain the amount of damages required to properly compensate District for failure of Contractor to complete the Project within the time fixed by this Agreement, Contractor shall pay to District the sum of Two Hundred Dollars ($200) per calendar day as liquidated damages for each calendar day that the Project shall remain incomplete past the date herein established for completion up to and including thirty (30) calendar days past the date established for completion, and the sum of Four Hundred Fifty Dollars ($450) per calendar day thereafter. The District reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsible bidder based on base bid not including unit prices if required in the bid form and reject all other bids, and/or to waive any informalities or irregularities, in any bid which it may deem necessary in the best interests of the Santa Maria Public Airport District.

Award

Transportation Terminals

$159,800.00

Public - City

Renovation

5

12

6

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
38
Bidding Soon
554
All Active Projects
262
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 6, 2023

May 8, 2023

June 30, 2023

img_map_placeholder

3217 Terminal Dr, Santa Maria, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.