BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 16, 2023 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a mixed-use development in South Whitehall Township, Pennsylvania. Completed plans call for the construction of a 40,000-square-foot, two-story above grade office development; and for site work for a office development.

Project Descriptions: Separate sealed Bids are requested for the PSD New Operations Center. Work includes new 2 story building with 30,000 sf lower- level warehousing/storage space and 10,000 sf upper-level administrative offices. Project includes related site development and utility work. Work is intended to be bid as the following Prime Contracts: BP-01: Earthwork & Sitework BP-02: Concrete BP-03: Masonry BP-04: Structural Steel BP-05: Miscellaneous Metals BP-06: Food Service Equipment BP-07: Metal Studs/Drywall/Exterior Cladding/Ceilings/Specialties BP-08: Roofing BP-09: Ceramic/Paver Tile BP-10: Flooring & Carpeting BP-11: Painting BP-12: Casework & Millwork BP-13: Curtainwall/Storefront/Interior Glazing BP-14: HVAC / Mechanical BP-15: Plumbing BP-16: Fire Protection BP-17: Electrical/Communications/Safety & Security BP-18: Landscaping Bidding Documents will be available Monday, March 13, 2023, at 1:00 pm. Each of the Bids must be accompanied by those Documents and materials described in the Proposal Checklist provided in the Project Manual. Each Bid must be accompanied by a Certified Check, money order or cashier s good faith check payable to the Order of Parkland School District or Bid Bond in an amount not less than 10 percent (10%) of the total bid, as security. Performance and Payment Bonds are required. Each Bid must be accompanied by a Non- Collusion Affidavit in the form set forth in the Bidding Documents. Bidders on this Work and all subcontractors shall comply with all provisions of the Pennsylvania Prevailing Wage Act. Upon receipt and opening of the bids, the School District reserves the right to hold the Bids for up to a period of sixty (60) days thereafter before making the Award. School District reserves the right to reject any or all Bids, with or without cause, or to waive or permit cure of any minor deficiency or irregularity in accordance with Pennsylvania law. Bid Result. BP-01 Earthwork & Sitework: Livengood $254,544.00 BP-02 Structural Steel: Stewart-Amos $334,000.00 BP-03 Metal Studs/Drywall/Ceilings/Metal Panels: GH Baver $208,025.00 BP-04 Curtainwall/Glazing: ESI $53,850.00 BP-05 HVAC/Mechanical: Tri-County Mechanical $144,346.0

Bid Results

Office

$994,765.00

Public - City

New Construction, Site Work

122

29

1

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
679
Active Projects
323
Bidding Soon
4,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

January 8, 2024

Project location map

2619 Stadium Dr, South Whitehall Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.