Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 16, 2023 at 7:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in South Whitehall Township, Pennsylvania. Completed plans call for the construction of a 40,000-square-foot, two-story above grade office development; and for site work for a office development.
Project Descriptions: Separate sealed Bids are requested for the PSD New Operations Center. Work includes new 2 story building with 30,000 sf lower- level warehousing/storage space and 10,000 sf upper-level administrative offices. Project includes related site development and utility work. Work is intended to be bid as the following Prime Contracts: BP-01: Earthwork & Sitework BP-02: Concrete BP-03: Masonry BP-04: Structural Steel BP-05: Miscellaneous Metals BP-06: Food Service Equipment BP-07: Metal Studs/Drywall/Exterior Cladding/Ceilings/Specialties BP-08: Roofing BP-09: Ceramic/Paver Tile BP-10: Flooring & Carpeting BP-11: Painting BP-12: Casework & Millwork BP-13: Curtainwall/Storefront/Interior Glazing BP-14: HVAC / Mechanical BP-15: Plumbing BP-16: Fire Protection BP-17: Electrical/Communications/Safety & Security BP-18: Landscaping Bidding Documents will be available Monday, March 13, 2023, at 1:00 pm. Each of the Bids must be accompanied by those Documents and materials described in the Proposal Checklist provided in the Project Manual. Each Bid must be accompanied by a Certified Check, money order or cashier s good faith check payable to the Order of Parkland School District or Bid Bond in an amount not less than 10 percent (10%) of the total bid, as security. Performance and Payment Bonds are required. Each Bid must be accompanied by a Non- Collusion Affidavit in the form set forth in the Bidding Documents. Bidders on this Work and all subcontractors shall comply with all provisions of the Pennsylvania Prevailing Wage Act. Upon receipt and opening of the bids, the School District reserves the right to hold the Bids for up to a period of sixty (60) days thereafter before making the Award. School District reserves the right to reject any or all Bids, with or without cause, or to waive or permit cure of any minor deficiency or irregularity in accordance with Pennsylvania law. Bid Result. BP-01 Earthwork & Sitework: Livengood $254,544.00 BP-02 Structural Steel: Stewart-Amos $334,000.00 BP-03 Metal Studs/Drywall/Ceilings/Metal Panels: GH Baver $208,025.00 BP-04 Curtainwall/Glazing: ESI $53,850.00 BP-05 HVAC/Mechanical: Tri-County Mechanical $144,346.0
Bid Results
Office
$994,765.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2023
January 8, 2024

2619 Stadium Dr, South Whitehall Township, PA
Related To This Project
South Whitehall Township, PA
Bid Date: May 03 2023
South Whitehall Township, PA
Bid Date: Dec 28 2023
South Whitehall Township, PA
Bid Date: Sep 29 2023
South Whitehall Township, PA
Bid Date: Jan 05 2022
South Whitehall Township, PA
Bid Date: Nov 09 2023
South Whitehall Township, PA
Bid Date: Dec 07 2023
South Whitehall Township, PA
Bid Date: Apr 02 2025
South Whitehall Township, PA
Bid Date: Apr 09 2025
South Whitehall Township, PA
--
South Whitehall Township, PA
Bid Date: Jul 27 2023
South Whitehall Township, PA
--
South Whitehall Township, PA
--
Cheltenham Township, PA
--
Cheltenham Township, PA
--
Cheltenham Township, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.