BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Mesa, Arizona. Completed plans call for site work for a educational facility.

Summary This project is to include exterior weatherization improvements at Franklin at Brimhall. Question Submission Deadline:March 14, 2023, 10:00am Question Response Deadline:March 21, 2023, 10:00am The low vendor will be required to mail, or hand deliver the original bid bond to the buyer in 48 hours after the bid due date and time. The original bond will be returned to the successful bidder upon the execution of satisfactory performance, payment bond, and contract, as prescribed by Arizona Revised Statutes. The bid will not be considered valid if the required original bid bond is not received by the buyer in 48 hours. Cost of bid bond must be included in bid price. If the submitting vendor is providing a certified or cashier's check this must be submitted and received by the buyer prior to the bid opening. Liquidated Damages Contractor shall be liable for and shall pay District the sum of $1,000 per day as liquidated damages, and not as a penalty, for each calendar day of delay after the date specified in the Solicitation or any extension thereof granted by District for completion of work until the work is complete. Contractor shall pay liquidated damages to District without limiting District's right to terminate the Contract for default as provided elsewhere herein. District shall grant an extension for completion of work if the work is delayed for an unforeseeable cause beyond the control and without fault of Contractor and Contractor notifies District in writing immediately in writing of the cause of the delay and provides sufficient information for District to determine whether an extension is justified. The District shall determine whether an extension is justified in its sole discretion. Retention Retention will be held in accordance with R7-2-1104. Ten percent retention shall be retained by the school district as insurance of proper performance of the contract. When fifty percent completed, one-half of the amount retained shall be paid to the contractor upon the contractor's request provided the contractor is making satisfactory progress. Subcontractors Each bidder shall submit with the bid, a complete list of all subcontractors the bidder proposes to use, if applicable. Failure to submit a subcontractor's list may constitute sufficient grounds on which to reject the bid. It is the responsibility of the bidder to insure Mesa Schools that all subcontractors hold a valid commercial license and are bonded through the State of Arizona Registrar of Contractors. Only subcontractors who are properly licensed and bonded for performance and labor and materials payment for this work shall be retained by the contractor. The bidder shall supply proof of certification, as stated in this Request for Proposal, for any subcontractors they may retain. This shall be a minimum requirement in evaluating the acceptability of a subcontractor. The Mesa Unified School District reserves the right to reject proposed subcontractors. All subcontractors must be approved by the school district prior to start of work. It is the responsibility of the bidder to ascertain that all subcontractors are properly insured prior to commencing work on Mesa School property. Verification that the subcontractors are properly licensed through the State of Arizona will be done prior to making a recommendation to the governing board. If a subcontractor fails to fulfill the responsibilities as set forth by the general contractor, the general contractor will then be allowed up to, and including, five (5) calendar days to replace the vacancy resulting from the non-responsive subcontractor. This vacancy is to be filled by another subcontractor who is properly insured and licensed and bonded by the State of Arizona Registrar of Contractors. It is the responsibility of the general contractor to advise the District that a subcontractor has been replaced by another qualifying subcontractor. The contract sum shall not be increased by the difference in cost occasioned by such substitution. If the Contractor refuses to provide an acceptable substitution at the same contract sum, this bid shall be rejected and the next lowest bidder will be considered, the previous low bidder being in default on his bid and no longer eligible for consideration. The rejected bidder's Bid Bond shall, at the District's discretion be subject to forfeiture. Extra Work The contractor shall perform such extra work and charge the owner at actual cost of labor and materials. The contractor shall have the right to add not more than 10% to the subcontractor's prices for authorized extra work performed solely by the subcontractor's. Such percentage shall include all of the contractor's charges for overhead, profit, administration and supervision. A 10% mark-up for overhead, profit, administration and supervision may be added to the contractor's cost of labor and materials for extra work authorized to be done by their own forces. The subcontractor's maximum allowable additions for overhead, profit, administration and supervision shall not exceed 10% of cost of labor and materials. The contractor and subcontractors will not be allowed any additional compensation beyond the allowable markups for overhead, profit, administration and supervision as noted above. Note: Any additional work must have prior written approval by the District Representative, before the contractor proceeds with work. Final Acceptance Upon completion, the contractor shall schedule a joint inspection of the completed work for final acceptance. All punch list items generated during the joint inspection shall be completed to the satisfaction of the District before the final payment will be released. Final Payment Before the final payment will be released the contractor must complete the following: 1. All punch list items generated during the final joint inspection shall be completed to the satisfaction of the District. 2. Contractor to provide onsite training for maintenance personnel as per District project manager's direction. 3. The contractor shall have delivered all required submittals and shop drawings to the District. 4. Project Record Documents A. As the work progresses, the Contractor shall maintain a complete and accurate record of changes or deviations from the Contract Documents and Shop Drawings, indicating the Work as actually installed. Record information in the appropriate locations on a record set of prints of the Drawings and Shop Drawings and a copy of the Specifications which are maintained solely for the purpose of this documentation. Keep this record set of Contract Documents and Shop Drawings at the project site for review by the Owner and Architect. Information contained in the record documents shall include, but not be limited to: a. Modifications made by Addenda, Change Orders, Construction Changes Directives and Architect's Supplemental Instructions which shall be transferred to the record documents. b. Modifications made to accommodate field conditions. B. Upon Substantial Completion of Work, deliver a complete set of Record Documents including prints, shop drawings and annotated Specification. Additionally, provide three (3) sets of electronic copies on a USB of each of the previously mentioned documents to the Architect for Approval. C. Owner's Manual: Prior to final payment, submit three (3) sets of electronic copies on a USB containing the following required submittals and any others required in other sections, suitably typed, indexed and labeled for ready reference: a. Subcontractors, major suppliers list with companies' names, addresses and telephone numbers. b. Warranties and certifications. c. Affidavit from general and subcontractors on use of asbestos free materials. d. Maintenance/operation instructions and parts list (other than Divisions 15 and 16). e. Copy of project Purchase Order. f. Copy of all submittals and shop drawings. g. Copy of Contractors last pay application. h. List of Extra Materials supplied to Owner, signed by Owner's representative. i. Other items required by the Specifications. Scope of Work The overall scope of work incudes but is not limited to the removal and replacement of all exterior sealants at wall through penetrations, control joints, expansion joints at the building perimeter, perimeters of all windows, and door frames. Repair of standing seam metal panels. Minor grading work at building perimeters adjacent to landscaped areas to improve and maintain positive drainage away from the building. Power wash all exterior surfaces including metal siding, masonry walls and removal of efflorescence. Preparation of exterior surfaces including doors and frames to receive new paint, and replacement of door sweeps and weather stripping. Repair and fill cracks on exterior masonry walls. At fenestration remove all existing, failing sealants, glazing, and frames. Replace windows as per plans. Replace door sealants and sweeps. Repair stem walls, lower portion of downspouts attached to walls. Prep, block fill and recoat all exterior surfaces with an approved elastomeric coating system per manufacturer's specifications.

Post-Bid

Educational

$521,500.00

Public - City

Site Work

1

1

18

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
42
Bidding Soon
1,001
All Active Projects
442
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.