BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of a detention facility in Moravia, New York. Completed plans call for the renovation of a detention facility.

Replace Triplex (3) Unit Water Softening System. New Units Must Have a Capacity Equal to or in Excess of Existing Water Softening System. Approved Replacement Systems Are Marlo Mrg Series and Ats Model Nxt900-3 Triple. Other Equal Units Will Be Considered. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 5%

Bid Results

Jails / Prisons

$113,350.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
137
Bidding Soon
1,569
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

March 20, 2024

Project location map

2202 NY-38A, Moravia, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.