BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement and new construction of a mixed-use development in Cincinnati, Ohio. Working plans call for the construction of a 72,236-square-foot educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

As of October 8, 2024, the construction manager has been identified and this project has finished bidding for subcontractors. There are no remaining subcontractor opportunities. Construction is expected to begin November 1, 2024, and finish June 2026. Submit all questions regarding this RFQ in writing to Procurement@ofcc.ohio.gov with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC at portal on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. Project Description Design and construction of a new middle/high school for grades 7 through 12. The total square footage planned for the new middle/high school is 72,236 co-funded square feet. Planned enrollment for the new middle/high school is 418. Achieving LEED silver certification under version 4.0 for the new middle/high school is required at a minimum. At this time, the project will not include a design of a storm shelter within the building, however an allowance remains in the project in the event the District elects to incorporate the scope at a later date. The co-funded budget for the project is $29,724,029 which includes all allowances. The delivery method for the new middle/high school will be CM at Risk. The local share of the project is being funded via ELPP credit. Locally funded initiatives (LFI) have not yet been determined but may be incorporated into the project. A Project Agreement LFI of $1,121,671 is incorporated into the overall project budget and represents the differential cost between Base plan and Preferred plan to satisfy the 100% Cap. The District may choose to include the button-up scope of remaining structures and athletic field improvements as a District funded project. This scope would be performed under a separate contract. Co-funded scope also includes abatement and demolition allowances for the following buildings: Brent Elementary School. The existing square footage of Brent Elementary School is approximately 35,741 SF. The delivery method for this scope of work will be General Contracting. Whitaker Elementary School. The existing square footage of Whitaker Elementary School is approximately 66,084 SF. The delivery method for this scope of work will be General Contracting. Finneytown High School. The existing square footage of Finneytown High School is approximately 174,774 SF. The delivery method for this scope of work will be CM at Risk.* *The School District may choose to keep portions of the existing building in place Scope of Services Upon award of the Agreement, commence by developing the Program of Requirements (POR). The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement. Anticipated Schedule State Funding: $28,602,358 Other Funding: $1,121,671 Construction Cost: $24,990,502 Total Project Cost: $29,724,029 Anticipated Schedule Professional Services Start: 04 / 23 Construction Notice to Proceed: 06 / 24 Substantial Completion of all Work: 06 / 26 Professional Services Completed: 08 / 26 Estimated Basic Fee Range (see note below) 6.00% to 6.50% EDGE Participation Goal Percent of initial Total A/E Fee: 5.0%

Pre-Construction/Negotiated

Educational

$29,724,029.00

Public - State/Provincial

Asbestos Abatement, LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
54
Bidding Soon
1,215
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

November 1, 2024

img_map_placeholder

8916 Fontainebleau Terrace, Cincinnati, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.