BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Millbrae, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Online Q&A Yes Q&A Deadline 03/24/2023 2:00 PM (PDT) Response Format Electronic In general, the work to be performed consists of mobilization, traffic control and construction signage, asphalt concrete removal, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, PCC curb & gutter removal and replacement, PCC driveway apron removal and replacement, PCC sidewalk removal and replacement, miscellaneous concrete repairs, manhole frame and utility cover adjusting and restoring to grade, underground utility location, survey monument protection, striping removal & replacement, raised pavement markers removal and replacement and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer. A certified check or corporate surety bond of not less than ten percent (10%) of the amount bid for the total cost of the project must accompany each proposal. The physical bond/check MUST be provided to the City either hand delivered or mailed to the attention of: Sam Bautista, Public Works Director, 621 Magnolia Avenue, Millbrae, CA 94030 within two (2) business days after bid opening. Time of Completion shall be One Hundred (working days after issuance of the Notice to Proceed. Liquidated damages for failure to complete the work within the specified time are specified in the Contract Documents. If the Bidder is awarded the Contract but fails to complete the work within the Contract time limit set forth above, or as it may be extended as provided in the Contract Documents, Bidder agrees to pay liquidated damages to the City at the rate of Two-Thousand ($2,000) per each calendar day until the work is satisfactorily completed. Location- (PALM AVENUE, HAZEL AVENUE, LAUREL AVENUE, ASHTON AVENUE, EL PASEO & ALMENAR STREET)

Award

Roads / Highways

$1,430,790.00

Public - City

Paving, Site Work

9

7

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
81
Bidding Soon
1,740
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2023

June 1, 2023

img_map_placeholder

Multiple Locations, Millbrae, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.