Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Nacogdoches, Texas. Completed plans call for the renovation of a educational facility; and power facility.
As of April 4, 2023, this project has not yet been awarded. A timeline for award has not yet been established. SCOPE OF PROPOSAL Stephen F. Austin State University, hereafter referred to as "SFA" or "the University", is seeking proposals, in accordance with Gov't Code 51.783, for a mechanical contractor to perform mechanical contractor services associated with HVAC renovations to the Kerr & Griffith Hall and associated Power Plant located on the campus of Stephen F. Austin State University, Nacogdoches, Texas, in accordance with the Engineering and Consulting Documents, Uniform General Conditions, Supplemental Conditions and other Exhibits herein and attached. 1.2 SFA INFORMATION Stephen F. Austin State University is a comprehensive, regional institution located in Nacogdoches, Texas. The University enrolls approximately 11,000 students, offering approximately 80 undergraduate majors and more than 120 areas of study within six academic colleges - business, education, fine arts, forestry and agriculture, liberal and applied arts, and sciences and mathematics. Accredited by the Southern Association of Colleges and Schools, SFA provides the academic breadth of a state university with the personalized attention of a private school. Since its founding in 1923, Stephen F. Austin State University has established a reputation of providing a traditional, residential college experience serving approximately 3,500 students making SFA residence halls their home-away-from-home. To meet the needs of these students, SFA employs approximately 1600 full and part-time faculty and staff and operates as an agency of the State of Texas. The Board of Regents is the nine-member governing body of SFA. Regents are appointed by the governor of Texas and serve staggered six-year terms. 1.3 PROJECT COMPLETION The University requires that the job be substantially completed by August 9, 2024 and final completion, including clean-up by October 9, 2024. Planned construction start date is on or after May 13, 2024. All work is to be coordinated with Bill Richardson, Assistant Director of Construction, 936.553.8787, William.Richardson@sfasu.edu and/or Allen Singleton, Mechanical Maintenance/Building Trades Manager, 936.468.4546, ajsingleton@sfasu.edu . The university's HUB goal for this procurement is: 32.9 % for Special Trades Construction Each HUB subcontracting plan is evaluated independently of the response. If the HSP does not reflect a good faith effort to subcontract with HUBs, the entire response is disqualified. All questions regarding the HUB Subcontracting Plan may be directed to the Executive Director of Finance and Administrative Services/HUB Coordinator, Kay Johnson, 936.468.6550, johnsondk6@sfasu.edu. SCOPE OF WORK Stephen F. Austin State University, hereafter referred to as "SFA" or "the University", is seeking proposals in accordance with Gov't Code 51.783 for a mechanical contractor to perform mechanical contractor services associated with HVAC renovations in the Kerr and Griffith Halls and associated Power Plant on the campus of Stephen F. Austin State University, Nacogdoches, Texas in accordance with the Project Manual, Uniform General Conditions, Supplemental Conditions and other Exhibits herein and attached.
Award
Educational
$230,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2023
May 13, 2024
1936 North St, Nacogdoches, TX
Related To This Project
Nacogdoches, TX
Bid Date: Mar 31 2023
Nacogdoches, TX
Bid Date: Mar 19 2020
Nacogdoches, TX
Bid Date: Apr 13 2023
Nacogdoches, TX
Bid Date: Apr 13 2023
Nacogdoches, TX
Bid Date: Apr 11 2023
Nacogdoches, TX
Bid Date: Apr 11 2023
Nacogdoches, TX
Bid Date: May 05 2023
Nacogdoches, TX
Bid Date: Apr 12 2023
Nacogdoches, TX
Bid Date: Oct 25 2018
Nacogdoches, TX
Bid Date: Oct 25 2018
Nacogdoches, TX
Bid Date: Mar 29 2023
Nacogdoches, TX
Bid Date: Mar 15 2023
Nacogdoches, TX
Bid Date: Sep 18 2019
Nacogdoches, TX
--
Nacogdoches, TX
Bid Date: Mar 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.