Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 14, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a road / highway in Apple Valley, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This project generally consists of supplying certain specified materials, equipment, and labor to perform bituminous removal, common excavation, ADA pedestrian ramps, bituminous trail overlay, storm sewer utilities, amenity nodes, landscaping, pedestrian bridge, and other related activities within the City of Apple Valley. City Project 2021-150 NORTH CREEK GREENWAY GAPS - TRAIL IMPROVEMENTS 4,000 SY MILL BITUMINOUS PAVEMENT 1,500 CY COMMON EXCAVATION 1,200 CY AGGREGATE BASE CL 5 1,850 TON BITUMINOUS PAVING (TRAIL) 1 LUMP SUM PREFABRICATED PEDESTRIAN BRIDGE 650 SY 8" CONCRETE PAVEMENT 6,700 SF CONCRETE WALK 280 LF BOULDER RETAINING WALL 2,100 CY TOPSOIL 80 EACH DECIDUOUS TREES 40 EACH ORNAMENTAL TREES 740 EACH PERENNIALS 250 EACH DECIDUOUS SHRUBS The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid. Any, and all questions bidders may have in connection with this solicitation are to be directed by email only to: Jodie.scheidt@applevalleymn.gov No bidder questions will be addressed after 12:00 pm on Friday, April 7, 2023. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The successful bidder must be a "responsible contractor.
Bid Results
Roads / Highways
$1,985,579.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2023
May 15, 2023
To Be Determined, Apple Valley, MN
Related To This Project
Apple Valley, MN
Bid Date: Apr 07 2023
Apple Valley, MN
Bid Date: Apr 18 2023
Apple Valley, MN
--
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Jun 06 2023
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Apr 11 2023
Apple Valley, MN
Bid Date: Apr 11 2023
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Feb 18 2021
Apple Valley, MN
Bid Date: Feb 28 2023
Apple Valley, MN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
