BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in McMinnville, Tennessee. Completed plans call for the renovation of a transportation facility.

**As of June 9, 2023 this project has not yet been awarded. A timeline for award has not yet been established.** In case of tie bids, Warren County, Tennessee reserves the right to negotiate with bidders No bidder may withdraw his bid for a period of Sixty (60) Days after date set for opening of the bids For bid specifications or more information regarding bids, please contact Warren County Memorial Airport Manager Jim Dyer or Warren County Finance Department Charles Johnson Method 1 Install new 7/16" thick OSB with screws over the entire hanger and office roof surface. Sixteen screws per 4'X8' sheet. Remove all unnecessary penetrations. Install new vapor barrier underlayment, either GAF Storm Guard, FT Synthetic Platinum, or an approved equivalent product, over entire roof area. Install new 26-gauge standing seam metal roofing custom curved panels over the hangar. Panels are to be formed on the jobsite and installed. Panels are to be fastened a minimum of every two feet with ULP clips, two screws per clip, that penetrate into the original metal roof. Install 24-gauge metal drip and transition metal. No ridge cap to be installed. Clean and prepare built-in gutter system between curved roof maintenance hangar and adjoining taller main hangar. Install GAF Storm Guard, or an approved equivalent roofing underlayment in bottom of gutter. Install 60 mil black EPDM roof membrane into gutter, fully adhered on the sides, to attach under the metal on the adjoining hangar and under the new roof on the maintenance hangar. Method 2 Install new 1 inch ISO board over entire barrel roof hanger. Each ISO board will have a minimum of 8- 3- inch insulation plates per board. There will be a 1-inch thick plywood (unless otherwise approved) nail strip around the perimeter of roof line. Over the office area attached to hangar, install fluted Styrofoam fitted into R panel, then install tapered insulation to make a seamless transition onto the barrel roof. Install a 24-gauge metal drip edge around the perimeter nailed every 6 inches. Apply 60 mil thickness TPO membrane. The membrane will be a recognized name brand such as Firestone, Carlisle, Mule Hide, etc. The membrane must be fully adhered and mechanically attached. Install six-inch cover tape around the perimeter installed over the 24-gauge metal drip edge. A 20-year NDL warranty is requested. Clean and prepare built-in gutter system between curved roof maintenance hangar and adjoining taller main hangar. Install GAF Storm Guard, or an approved equivalent roofing underlayment in bottom of gutter. Install 60 mil black EPDM roof membrane into gutter, fully adhered on the sides, to attach under the metal on the adjoining hangar and under the new roof on the maintenance hangar. Bid Result. Method 1 Bid: Genesis Roofing $89,650.00 Method 2 Bid: Tri-State Roofing $47,556.00 Gutter Addition:Tri-State Roofing $1,813.00

Bid Results

Transportation Terminals

$139,019.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
109
Bidding Soon
1,251
All Active Projects
528
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 10, 2023

May 10, 2023

img_map_placeholder

4187 Old Nashville Hwy, McMinnville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.