Site work and paving for a mixed-use development in Oak Creek, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The work, officially known as Project No. 23005, North Lakefront Bluff Stabilization and Revetment, consists of stabilizing a high shoreline bluff installation of a new near-shore revetment along the Lake Michigan shoreline, and demolition of an abandoned former pumphouse. Pre-qualifications for each type of work are required and are included in the Specifications. No in-water work shall be conducted between August 1, 2023, through September 30, 2023 as required by the State of Wisconsin Department of Natural Resources fish avoidance window. Work that is not in-water, or is on dry lakebed, may be conducted during this time period. Work is required to stabilize an approximately 80-feet tall bluff that is currently unstable, with an approximately 40-foot-tall vertical scarp at the base and consisting of both native material and legacy industrial fill including an historic ravine containing coal ash and other unknown fill. The length of bluff stabilization portion of the project is approximately 1,250 feet. The site is a brownfield site, and the bluff stabilization will also function as an environmental cap; therefor, the appropriate documentation of capping and environmental requirements regarding soil handling are required. The revetment will be installed approximately 120 to 160 feet offshore for a length of approximately 2,250 feet, in depths of water ranging from approximately 6 to 9 feet deep. A stone layer will be installed between the new revetment and the existing toe of bluff. The revetment construction will include both new installation and installation of new revetment required to interlock with existing offshore breakwaters. An existing legacy industrial pumphouse at the bottom of the bluff will be demolished and material disposed properly at a licensed landfill.
Post-Bid
Roads / Highways
$170,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2023
May 1, 2023
To Be Determined, Oak Creek, WI
Related To This Project
Oak Creek, WI
Bid Date: Mar 31 2023
Oak Creek, WI
Bid Date: Apr 05 2023
Oak Creek, WI
Bid Date: Apr 11 2023
Oak Creek, WI
Bid Date: Mar 31 2023
Oak Creek, WI
Bid Date: May 18 2023
Oak Creek, WI
Bid Date: Apr 14 2023
Oak Creek, WI
Bid Date: Nov 05 2021
Oak Creek, WI
Bid Date: Apr 13 2023
Oak Creek, WI
Bid Date: Mar 31 2023
Oak Creek, WI
--
Oak Creek, WI
Bid Date: Mar 17 2023
Oak Creek, WI
Bid Date: Mar 16 2023
Oak Creek, WI
Bid Date: Dec 05 2024
Oak Creek, WI
Bid Date: Mar 09 2023
Oak Creek, WI
Bid Date: Feb 02 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.