EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 6, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a power facility in Traverse City, Michigan. Completed plans call for site work for a power facility.

The Contractor shall furnish and install the steel structures and metal bussing, all as specified and shown on the Drawings. The Contractor shall furnish all bolts and miscellaneous hardware to mount equipment to structural steel and to connect equipment together. The substation structure shall be fabricated and assembled to meet standard practices and specifications as recommended by American Institute of Steel Construction (AISC) and in a manner so that basic electric design clearances shown and noted on the Drawings will be met, and no where shall such clearances be less than recommended by NEMA and ANSI Standards at such points not expressly shown or noted. You are invited to bid on a general construction contract. The Contract provides for the furnishing of all labor, equipment, and materials necessary to complete the Grand Traverse Substation Split Project. The Owner will furnish certain material as listed in the Project Manual to the Contractor. The Contractor will be required to pickup and transport all material which is supplied from the Owner's warehouse to the project site and also be responsible for receipt and unloading of large material at the Project site(s). A. The requirements of this section apply to all other sections of Division 2. B. The work shall be executed in conformity with best practice and shall accommodate itself to the project. The Contractor shall consult the Drawings, shop drawings, and field layouts of other trades and shall be governed accordingly in the laying out and installation of his work. C. The Drawings are diagrammatic and indicate the general arrangement of systems and work included in the contract.

Bid Results

Power Plant

$239,328.00

Public - City

Site Work

85

16

8

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plants, Ground Covers
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
186
All Active Projects
101
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

May 4, 2023

img_map_placeholder

Multiple Locations, Traverse City, MI

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Grand Traverse Substation Split

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.