Published April 4, 2023 at 8:00 PM

Updated July 22, 2025

Site work for a mixed-use development in Hopkinton, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The scope of work includes: 1. Site Preparation, Demolition, and Erosion Control which includes mobilization, tree clearing, tree trimming, grubbing, sawcut existing pavement, removing and disposing existing riprap, removing and stacking existing stone wall, and installing erosion control barriers. 2. Basin Re-grading which includes removing existing gravel trench and PVC underdrain, removing existing PVC pipe and risers, temporary construction dewatering, all earthwork required to re-grade the proposed basins, and installation of new overflow stone spillway and riprap channel. Basin re-grading activities are anticipated to generate 450 cubic yards of material export. 3. Storm Drainage Pipe Installation which includes installing one (1) catch basin, 128 linear feet of 18-inch HDPE pipe, two (2) outlet control structures, 38 linear feet of 24-inch HDPE pipe, two flared end sections and associated stone protection, two (2) antiseepage collars, 443 linear feet of 18-inch HDPE pipe, two (2) drain manholes and covers, one connection to an existing manhole, and all associated appurtenances, excavation, dewatering, and backfill. 4. Site Restoration which includes resetting the existing stone wall, paving the existing driveway, all work associated with restoration of the 14 Hazel Road easement, and loam and seed disturbed areas. EMC Park Stormwater Improvements. The scope of work includes: rehabilitating and re-grading existing basins, installing new overflow stone spillway and riprap channel, and installing approximately 600 linear feet of storm drainage pipe and the associated drainage system. Site preparation, demolition, erosion control, and site restoration will be necessary, including all work associated with the restoration of the 14 Hazel Road easement.

Bid Results

Water / Sewer

$380,638.00

Public - City

Site Work

13

19

4

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
642
Active Projects
298
Bidding Soon
4,774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

Project location map

14 Hazel Rd, Hopkinton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.