Published April 4, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Hopkinton, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The scope of work includes: 1. Site Preparation, Demolition, and Erosion Control which includes mobilization, tree clearing, tree trimming, grubbing, sawcut existing pavement, removing and disposing existing riprap, removing and stacking existing stone wall, and installing erosion control barriers. 2. Basin Re-grading which includes removing existing gravel trench and PVC underdrain, removing existing PVC pipe and risers, temporary construction dewatering, all earthwork required to re-grade the proposed basins, and installation of new overflow stone spillway and riprap channel. Basin re-grading activities are anticipated to generate 450 cubic yards of material export. 3. Storm Drainage Pipe Installation which includes installing one (1) catch basin, 128 linear feet of 18-inch HDPE pipe, two (2) outlet control structures, 38 linear feet of 24-inch HDPE pipe, two flared end sections and associated stone protection, two (2) antiseepage collars, 443 linear feet of 18-inch HDPE pipe, two (2) drain manholes and covers, one connection to an existing manhole, and all associated appurtenances, excavation, dewatering, and backfill. 4. Site Restoration which includes resetting the existing stone wall, paving the existing driveway, all work associated with restoration of the 14 Hazel Road easement, and loam and seed disturbed areas. EMC Park Stormwater Improvements. The scope of work includes: rehabilitating and re-grading existing basins, installing new overflow stone spillway and riprap channel, and installing approximately 600 linear feet of storm drainage pipe and the associated drainage system. Site preparation, demolition, erosion control, and site restoration will be necessary, including all work associated with the restoration of the 14 Hazel Road easement.

Bid Results

Water / Sewer

$380,638.00

Public - City

Site Work

13

19

4

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
401
Active Projects
247
Bidding Soon
3,338
All Active Projects
1,444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

14 Hazel Rd, Hopkinton, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

EMC Park Stormwater Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.