BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Denton, Texas. Completed plans call for the renovation of a municipal facility.

This project to build an integrated student services support center. The center will modernize, streamline and holistically support the student experience, while improving efficiency and service. The physical center will reduce student telephone inquiries; reduction in case load and increase productivity; improve overall retention and persistence; reduction of student related bad debt. The work will be done in accordance with the plans and project manual. Contractor to provide detailed construction schedule according to the phases required: Ph1A - partial demolition (by UNT - not part of bid) Ph1B - Build back Substantial completion of 1st floor Registrar and 2nd floor Financial Aid by July 14 Ph2 - Demo and build back of ISSC Center 2nd floor from 7/17 - 10/6 Ph3A - 1st floor Student Accounting finishes upgrade 10/9 - 12/1 Ph3B - 1st and 2nd floor corridors/lobbies and restroom upgrades 12/4 - 1/5. Questions concerning this proposal should be directed to: Carrie Stoeckert Senior Construction Contract Coordinator University of North Texas System Strategic Infrastructure, Planning & Construction Carrie.stoeckert@untsystem.edu All questions must be received no later than 2:00 p.m. CST on March 28, 2023. All questions and answers will be posted to the website by 5:00 p.m. CST on March 31, 2023. Stantec Project No. 214001088, 2140001088 Interior renovation of the existing Eagle Student Service Center (built in 1985) on UNT Denton Campus. The work will take place in Three Phases Phase 1: Buildback of First floor Registrar and Second floor Financial Aid : Substantial completion by July 21, 2023. 2. Phase 2: Demolition and buildback of Second floor ISSC (former Registrar) including smoke barrier on Third floor: Substantial completion by October 6, 2023. 3. Phase 3: First floor Student Accounting, First and Second floor corridors / lobbies, and First and Second floor public restrooms : Substantial completion by 1/5/2024

Award

Municipal

$2,274,722.00

Public - State/Provincial

Renovation

88

37

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
79
Bidding Soon
3,519
All Active Projects
1,293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.