Renovation of an educational facility in Gardner, Massachusetts. Completed plans call for the renovation of a educational facility.
The scope of work includes all labor and materials to replace hot water basin on Marley NC8304 Cooling Tower 1 and Marley NC8304 Cooling Tower 2 located on the roof of the Haley Building. Scope of work: 1. All work to be done in accordance with the below scope of work provided on the follow page. 2. All materials, fabrics, finish materials and specifications to be included in bid package. 3. Scope of work is for reference only, it is highly recommended for contractor(s) to perform a site visit per the scheduled site visit. 4. All questions will be presented to Glen Fox, Director of Facilities Management (978-630- 6267) Scope of Work General Scope: The scope of work includes all labor and materials to replace hot water basin on Marley NC8304 Cooling Tower #1 and Marley NC8304 Cooling Tower #2. Additional information and photos are available below, but it is highly recommended to attend site visit scheduled March 22, 2023 at 9:00 AM. Cooling Tower #1 Replacement of hot water basin on Marley NC8304 Cooling Tower 1 located on the roof of the Haley Building. Materials to include but not limited to: basins, basin covers, nozzles, gaskets, sealer and associated hardware. Original hot water basin is corroded and has large holes and missing nozzles. This scope consists of rigging and installing new Marley factory replacement basin kit, front and back wall, distribution box and flume. Factory start up and disposal of all old material must be included in the bid. Cooling Tower #2 Replacement of hot water basin on Marley NC8304 Cooling Tower 2 located on the roof of the Haley Building. Materials to include but not limited to: basins, basin covers, nozzles, gaskets, sealer and associated hardware. Original hot water basin is corroded and has large holes and missing nozzles. This scope consists of rigging and installing new Marley factory replacement basin kit, front and back wall, distribution box and flume. Factory start up and disposal of all old material must be included in the bid. Requests for Interpretation: A: Bidders shall promptly notify the Awarding Authority of ambiguity, inconsistency or error which may be discovered upon examination of the Contract Documents, the site, and local conditions. B: Bidders requiring clarification or interpretation of the Contract Documents shall make a request to the Owner/Architect. The Owner/Architect will answer requests, in writing via addendum, if received not later than seven (7) calendar days before the date for receipt of the bids. All questions should be submitted in writing via email to gfox1@mwcc.mass.edu C: Interpretation, correction or change in the Contract Documents will be made by an Addendum which shall become part of the Contract Documents. Not later than 3 calendar days prior to receipt of bids, Addenda will be delivered by electronic mail to every individual or firm on record as having Contract Documents via regular mail. Failure of the Owner or Architect to send, or of a Bidder to receive, Addenda, will not relieve the Bidder from obligation under a bid as submitted. D: Throughout the bidding and construction process, interpretations which affect the cost of the Work shall be made in writing. Neither the Awarding Authority nor the Architect shall be responsible for oral instructions or oral interpretations. Verbal instructions or interpretations shall not be cause to amend the contract price or bid
Post-Bid
Educational
$68,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2023
April 28, 2023
444 Green St, Gardner, MA
Related To This Project
Gardner, MA
Bid Date: Jan 23 2019
Gardner, MA
Bid Date: May 24 2023
Gardner, MA
Bid Date: Jun 06 2023
Gardner, MA
Bid Date: May 30 2023
Gardner, MA
Bid Date: May 24 2023
Gardner, MA
Bid Date: Jun 28 2023
Gardner, MA
Bid Date: Jun 28 2023
Gardner, MA
Bid Date: Jul 06 2023
Gardner, MA
Bid Date: Mar 29 2023
Gardner, MA
Bid Date: Mar 21 2023
Gardner, MA
Bid Date: Jun 12 2020
Gardner, MA
Bid Date: Mar 20 2023
Gardner, MA
Bid Date: Mar 10 2023
Gardner, MA
Bid Date: Mar 17 2023
Gardner, MA
Bid Date: Feb 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.