Renovation of a transportation facility in Dalton, Georgia. Working plans call for the renovation of a transportation facility.

As of May 4, 2023. The project has been cancelled due to no bidders received and no information to rebid the project at this time. Bids received after the designated time will not be considered. Total Contract Time for delivery and installation is one hundred twenty (120) calendar days from contract execution date. No proposal may be withdrawn by the Owner within sixty (60) days after actual date of opening thereof. The City of Dalton reserves the right to reject any and all proposals, to waive any informalities or irregularities in the proposals received and to accept that which is deemed most qualified to the City of Dalton. Questions may be directed to: Contact Name: Andrew Wiersma Contact Address: 4483 Airport Rd Dalton, GA 30721 Contact Telephone: 706-618-4384 Email Address: awiersma@daltonga.gov INTRODUCTION The City of Dalton welcomes proposals for the project: Airport Veeder Root replacement at Dalton Municipal Airport. Please take the time to carefully read and become familiar with the proposal requirements. All proposals submitted for consideration must be received by the time specified above under the "Proposal Submission Deadline." PROJECT OBJECTIVE The objective of this project is to provide and install a new electronic tank monitoring system to replace the existing Veeder Root TLS-300C electronic tank monitoring system which was damaged by lightning. PROJECT SCOPE AND SPECIFICATIONS Project scope includes all necessary materials and labor to replace the existing Veeder Root TLS300C electronic tank monitoring system with a new electronic tank monitoring system of equal or greater technical capability. Existing system monitors two (2), 12,000 gallon above-ground fuel storage tanks. Both tanks are 10ft in diameter. The existing system includes a total of two (2) in-tank 12ft probes (1 per tank) and approximately 800ft of wire pulled through existing conduit to monitor unit. Contractor is encouraged to propose whatever is necessary to best meet project objective. See page 5 for site drawings and specifications. PROJECT TIMELINE Project is needed ASAP with a completion date of no later than July 1, 2023.

Final Planning

Transportation Terminals

$20,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
69
Bidding Soon
1,289
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

October 4, 2023

img_map_placeholder

To Be Determined, Dalton, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.