Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a multi-residential development in Carver, Massachusetts. Completed plans call for the renovation of a multi-residential development.
As of April 21, 2023, this project has not yet been awarded. The project is expected to be awarded within the next 3 weeks. Fire Alarm System upgrade at 6 Fuller Street, Carver Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Carver Housing Authority, the Awarding Authority, invites sealed bids from Contractors for the Fire Alarm System Replacement in Carver, Massachusetts, in accordance with the documents prepared by John Murphy Jr Electrical Construction & Eng. and all incidental work necessary to complete the Project. The Project consists of: Installation of new addressable fire alarm panel and devices. Work to include removal of the old fire alarm panel and devices after the new system has been signed off by the fire department.. Bids are subject to M.G.L. c.14944A(2)(B) and to minimum wage rates as required by M.G.L. c.l49 26 to 27H inclusive Bid Deposit - Not required.
Bid Results
Multi-Residential
$42,985.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2023
April 28, 2023
6 Fuller St, Carver, MA
Related To This Project
Carver, MA
Bid Date: Mar 08 2021
Carver, MA
--
Carver, MA
--
Carver, MA
Bid Date: Aug 03 2023
Carver, MA
Bid Date: Sep 27 2023
Carver, MA
--
Carver, MA
--
Carver, MA
--
Carver, MA
--
Carver, MA
Bid Date: Sep 15 2022
Carver, MA
--
Carver, MA
Bid Date: Nov 14 2019
Carver, MA
Bid Date: Feb 19 2020
Carver, MA
Bid Date: Sep 26 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
