BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Milton, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of July, 2023, construction is underway and expected to be completed in October, 2023, however, an exact timeline for construction has not been confirmed. The general contractor is still accepting subcontractor pricing, however, the bid may not be used for this specific project and be retained for future bidding opportunities. Counties: Escambia Road Name: Bridge Rehabilitation Limits: 48260213 Project(s): 45102915201(*) Federal Aid No: N/A Total Roadway Length: 2.617 Miles Contract Days: 80 Total Bridge Length: 2.617 Miles Total Proposal Length: 5.234 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Acquis. The Improvements under this District Contract consist of Repairs to Bridge on SR 8 (I-10) over Escambia Bay Bridge No 480213 in Escambia County. Repairs include spall repair, epoxy injection, penetrant sealer application, carbon fiber reinforced polymer wrap, fabric formed riprap installation, and bearing pad replacement. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order : 001 Bridge Rehabilitation

Under Construction

Bridges / Tunnels

$208,278.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
35
Bidding Soon
763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

July 3, 2023

Project location map

FL-8, Milton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.