Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Millbrae, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.
Q&A Deadline-03/30/2023 2:00 PM (PDT) Online Q&A-Yes Bid Bond-10.00% Payment Bond-100.00% Performance Bond-100.00%.A certified check or corporate surety bond of not less than ten percent (10%) of the amount bid for the total cost of the project must accompany each proposal. The physical bond/check must be provided to the city and mailed to the attention of: Bill Giang, Assistant Engineer, 621 Magnolia Avenue, Millbrae, CA 94030 within two (2) business days after bid opening. Scope Of work: The project consists of the upsizing approximately 1,800 linear feet of an existing 6-inch vitrified clay pipe to 8-inch-high density polyethylene pipe using the pipe bursting and open-cut/trenching method, reconnection of existing sewer laterals, and sewer manhole rehabilitations. Additionally, approximately 1,700 linear feet of new 8-inch water main will be installed in the roadway area (existing water main at the existing back of walk) which will include installation of valves, fittings, thrust blocks, as well as reconnection of the existing meter and hydrant laterals to the new main line. This project includes street light improvements which include installation of street light foundations, poles, LED fixtures, and pull boxes as well as running new conduit and wire within the roadway. Finally, the approximately 1,600 linear foot segment of Ahwahnee Drive shall undergo pavement rehabilitation, including grinding of existing pavement, recompacting the existing aggregate base/subbase, installing hot mix asphalt, constructing ADA curb ramps, sidewalk, curb, and gutter. The goal of these following requirements is to prevent the pollution of storm water runoff on construction projects by keeping pollution out of storm drains and creeks, reducing the exposure and discharge of materials and wastes to storm water, and by reducing the erosion and sedimentation. Storm drains discharge runoff directly to creeks and the bay without treatment. A. Install erosion control measures (silt fence and erosion control matting) where shown on plan (or as directed in the specifications for the various items of work) to prevent sediment-laden runoff from migrating into creeks and public storm drain system. B. Prohibit illicit discharge (non-rainwater) into the storm drain system. C. Construct, inspect and maintain any and all necessary systems to eliminate contaminants from entering the storm water system. D. Clean up and control of work site materials, spoils and debris. E. Removal of contaminants produced by the project. F. After job completion, removal of systems installed by the Contractor to control contaminants from entering the storm water system. G. The work shall include the provision of all labor, materials, equipment and apparatus not specifically mentioned herein or noted on the plans, but which are incidental and necessary to complete the work specified.
Under Construction
Roads / Highways
$2,712,058.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2023
June 5, 2023
Ahwahnee Dr, Millbrae, CA
Related To This Project
Millbrae, CA
--
Millbrae, CA
Bid Date: Jul 06 2023
Millbrae, CA
--
Millbrae, CA
Bid Date: Aug 14 2023
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
--
Millbrae, CA
Bid Date: Apr 11 2023
Millbrae, CA
Bid Date: Mar 31 2023
Millbrae, CA
--
Millbrae, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.