BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Fresno, California. Completed plans call for the renovation of a municipal facility.

The scope of work includes, but is not limited to; removal and replacement of existing roof membrane at the RWRF Administration Building. A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work. All Proposals Must Be Made on the Bid Proposal Form Provided by the Purchasing Manager. A Bid Deposit, Which Can Be Provided Separately, in the Amount of Ten Percent (10%) of the Total Net Bid Amount (or, in Bids With Add Alternates, the Highest Possible Combination of the Base Bid Plus Add Alternates) in the Form of a Certified or Cashier's Check, an Irrevocable Letter of Credit, or a Certificate of Deposit or a Bidder's Bond Executed by a Corporate Surety, Admitted by the California Insurance Commissioner to Do Business in California, Payable and Acceptable to the City of Fresno; or the Bidder Shall Have Registered With the Purchasing Manager of the City an Annual Bid Bond Sufficient to Provide Coverage in Such Amount. The City reserves the right to reject any and all bids. License Requirements C-39 Liquidated Damages $100.00 Per Each Calendar Day Project Duration 60 Working Days from Notice to Proceed Date Online Q&A No The Specifications describing this project have been carefully prepared. Any questions or concerns relating to these Specifications shall be directed in writing to the designated Procurement Specialist of the Purchasing Division (see cover page) and shall be sent by facsimile to the RightFax number on the cover page. A Bid Question form for this purpose has been included as page ix. The Construction Allocation for this project is $270,000.00.

Award

Municipal

$353,233.00

Public - City

Renovation

5

18

11

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
28
Bidding Soon
403
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

May 18, 2023

img_map_placeholder

5607 W Jensen Ave, Fresno, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.