BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a bridge / tunnel in Bryan, Texas. Completed plans call for the renovation of a bridge / tunnel.

The City believes that the data contained in these specifications is sufficient for the preparation of Competitive Sealed Proposals. Requests for additional information will be considered depending on the proposal time frame and the availability of the requested information. Such information will be submitted to all known Proposers simultaneously on the website mentioned above. In order to ensure a fair and public process, all questions related to this Request for Proposals shall be addressed in writing, Contact with any City of Bryan employee or official is prohibited without prior written consent from the City Purchasing Supervisor. Failure to observe this requirement may be grounds for rejection of the Proposal. Pursuant to Government Code Chapter 2269, subchapter D, the City of Bryan may enter into a contract with the Contractor meeting all the qualifications and specifications that submits the Competitive Sealed Proposal that offers the best value to the City. The City will evaluate and rank Proposals considering the selection criteria and weighted value set forth in the request for proposals. The City of Bryan reserves the right to accept or reject RFP#23-030 Page 5 any or all Proposals, to waive any informalities and technicalities, to accept the offer considered most advantageous and to award the Proposal to the vendor offering the best value to the City of Bryan. Additionally all Proposers are hereby notified that the City of Bryan shall consider all factors it believes to be relevant in the determination of the best value including, but not limited to, the proximity of the Proposer as it relates to their ability to perform the contract for the City of Bryan. Project Scope: The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: o Coordinate all construction activities with the Course Operator to ensure a safe construction site. o Prepare and administer the storm water pollution prevention plan, including installation of BMP's. o Remove existing bridge and cart path as shown in the plans. o Construct proposed bridge abutments and wing walls. o Furnish and install the pre-engineered bridge structure, including the cast in place deck, and construct the proposed cart path. o Clean up site and coordinate with the Course Operator to establish vegetation on all disturbed area. o All other appurtenances necessary to complete the Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. The selected Contractor will be also responsible for: obtaining all applicable permits and inspections; providing all necessary performance and payment bonds and insurance certificates; and providing the Owner with all manufacturers' warranties and all operations and maintenance (O & M) manuals for all equipment installed. The selected Contractor may be required to perform some or all of the following pre-construction and construction services. Preconstruction Services may include, but not necessarily be limited to, planning and value engineering the Work. Construction Services may include, but not necessarily be limited to, all work associated with construction, occupancy and warranty of the facilities. Question Deadline 03/27/2023 at 10:00 AM CT

Post-Bid

Bridges / Tunnels

$280,000.00

Public - City

Renovation

9

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
57
Bidding Soon
2,650
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 24, 2023

img_map_placeholder

1929 Country Club Dr, Bryan, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.