Published May 3, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a playground / park / athletic field in Williamsport, Pennsylvania. Completed plans call for the renovation of a playground / park / athletic field.

Estimated value range 200,000 to 600,000 is the range. Project: Rehabilitation of the Band Shell Building FEDERAL DAVIS BACON WAGE RATES APPLY TO THIS PROJECT, they are enclosed within.. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 10 percent of the Bid Amount. Notice is hereby given that the rehabilitation and renovation work associated with this project, for which construction proposals are being solicited, is a construction project constructed by a public entity constituting public works and is subject to applicable provisions of State and Federal Requirements. Bidders shall complete the electronic Bid Forms on PennBid, inclusive of uploading all required supporting documents. Your offer will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. Bid proposals will be opened and read aloud at a time/date TBD. An email notification will be sent out about the bid opening date/time in the future. The Owner reserves the right to accept or reject any or all offers and to waive any or all informalities, defects, errors, omissions, mistakes or irregularities in proposals, to reject any or all proposals or parts thereof. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Your firm is invited to submit an offer under seal to Owner for rehabilitation and renovation of the Band Shell Building located at: Packer Street Brandon Park Williamsport, PennsylvaniaProject Location ZIP Any questions regarding access to the PennBid system should be addressed to Jon Sander at (570) 220-1872. CLARIFICATION DEADLINE 4/24/2023 10:00 AM

Bid Results

Playgrounds / Parks / Athletic Fields

$567,900.00

Public - City

Renovation

21

30

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
57
Bidding Soon
832
All Active Projects
334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2023

May 31, 2023

img_map_placeholder

Packer St, Williamsport, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rehabilitation of the Band Shell Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.